Laserfiche WebLink
amec19 <br />inventoried the geomembrane and was present at all times during unloading of the <br />geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. <br />AMEC inspected and approved subgrade prior to geomembrane deployment. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench backfill. <br />AMEC observed the installation of the low volume solution collection system. <br />AMEC constantly monitored the LVSCF placement. Samples were also obtained of placed LVSCF <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue structural fill placement within the Phase 5 VLF. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue installation of the low volume solution collection system. <br />Continue installation of the high volume solution collection system. <br />Continue LVSCF placement. <br />Continue DCF placement. <br />VLF Weekly Report WE 09.18.10.13 <br />