My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IVA <br />_ 1 <br />+Arc <br />oo.�o�� <br />0 <br />0 <br />N <br />r <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 93,129 SOUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 2,616,404 SOUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />O iy <br />O _ <br />k <br />O <br />O <br />� o° C" CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />' PROJECT <br />= PHASE 5 VLF <br />QJ ' 00 TITLE <br />� �_ o PHASE 5 GEOMEMBRANE INSTALLATION <br />61 <br />PSSA SECONDARY 100 MIL <br />�! S DESIGNED BY I CMT CHECKED BY I JON I DATE <br />O/ � DRAWN BY CWT APPROVED BY JOH 09 /11/1 <br />�� , ` / / •O p <br />EARTH AND ENVIRONMENTAL <br />CADO FILENAME 116URE No. REV <br />f 3c 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.