My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g2{ QO F��QD iQ __oo <br />F '� 0 <br />00 - 8x 00 X10 }p0 <br />F X00 <br />DO <br />X <br />x <br />00 +010 <br />O <br />O <br />cli <br />k <br />O <br />O <br />LEGEND: <br />O <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />A* <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />r0 <br />EXISTING UNIMPROVED ROAD/TRAILS <br />O <br />'• <br />O <br />PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />O <br />W� <br />Eo <br />NOTES: <br />06 <br />APPROXIMATELY 19,215 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />/ <br />0 <br />I <br />/ <br />O <br />o° <br />00 <br />w <br />�x <br />/O <br />O <br />�O <br />O <br />O <br />N <br />Lu I <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />�+ T]rU <br />i PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />ODESIGNED BY CMT CHECKED BY JON DATE <br />+ DRAWN BY CMT APPROVED BY JON 09/11/1 <br />_ EARTH AND ENVIRONMENTAL OADD iR. "i fiGURE No. REV <br />3b 0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />'• <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />T <br />NOTES: <br />APPROXIMATELY 19,215 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />/ <br />DURING WEEK <br />I <br />/ <br />APPROXIMATELY 2,616,404 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />/O <br />O <br />C T_ <br />LLJ <br />O <br />O <br />N <br />Lu I <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />�+ T]rU <br />i PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />ODESIGNED BY CMT CHECKED BY JON DATE <br />+ DRAWN BY CMT APPROVED BY JON 09/11/1 <br />_ EARTH AND ENVIRONMENTAL OADD iR. "i fiGURE No. REV <br />3b 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.