My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec* <br />Earth & Environmental <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D -8 dozer, a CAT 320 <br />excavator, a CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, <br />and process the material. <br />Location <br />This Week <br />s <br />Cumulative <br />Comments <br />E Cresson Clay Processing <br />13,246 <br />35,216 <br />Comments <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />13,246 <br />265,620 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Confirmatory drilling was performed for Underground Working #3012. A drill pattern was set out <br />by an AMEC field representative. Sixty -one holes were dilled encountering thirty-six voids. An <br />approximate total of 3050 feet was drilled. An AMEC representative observed the confirmatory <br />drilling constantly. <br />B) Mine Shaft /Stope Remediation <br />Grouting of miss (no void) holes was performed at Underground Workings #3012. <br />Remediation of Underground Workings #3006/ #3007 continued with the placement of the <br />concrete plug. Approximately 100 cubic yards of 4000 -psi concrete was placed in the previously <br />prepared opening. The area inspected by an AMEC representative prior to concrete placement and <br />found to be constructed properly in competent and frost/ice free material. Two samples were <br />obtained randomly during concrete placement. Slump testing, air - entrainment testing, temperature <br />testing, and casting of five 6" x 12" cylinders was performed for each sample. All field properties <br />testing results were with in project specifications and performed in accordance with ASTM /ACI <br />standards. The cylinders cast will be transported to an off -site facility and tested for compressive <br />strength at specified curing ages. <br />VLF Weekly Report WE 03.06.10.D.doc <br />This Week <br />Location <br />� <br />Comments <br />(tons) <br />(tons) <br />Dump 4 LVSCF Processing <br />36,045 <br />177,303 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Confirmatory drilling was performed for Underground Working #3012. A drill pattern was set out <br />by an AMEC field representative. Sixty -one holes were dilled encountering thirty-six voids. An <br />approximate total of 3050 feet was drilled. An AMEC representative observed the confirmatory <br />drilling constantly. <br />B) Mine Shaft /Stope Remediation <br />Grouting of miss (no void) holes was performed at Underground Workings #3012. <br />Remediation of Underground Workings #3006/ #3007 continued with the placement of the <br />concrete plug. Approximately 100 cubic yards of 4000 -psi concrete was placed in the previously <br />prepared opening. The area inspected by an AMEC representative prior to concrete placement and <br />found to be constructed properly in competent and frost/ice free material. Two samples were <br />obtained randomly during concrete placement. Slump testing, air - entrainment testing, temperature <br />testing, and casting of five 6" x 12" cylinders was performed for each sample. All field properties <br />testing results were with in project specifications and performed in accordance with ASTM /ACI <br />standards. The cylinders cast will be transported to an off -site facility and tested for compressive <br />strength at specified curing ages. <br />VLF Weekly Report WE 03.06.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.