Laserfiche WebLink
ameO <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 6, 2010 <br />Reporting Period: 2/28/10 through 3/6/10 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />N <br />N <br />N <br />N <br />N- <br />D = Day Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 16 °F to 27 °F ( + / -) High: 34 °F to 50 °17 <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: No issues. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D -6 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem -axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A14 +00 ( + / -) and <br />A27 +00 ( + / -), approximately 10 to 150 feet left of centerline; between stations A54 +00 ( + / -) <br />and A58 +00 ( + / -), approximately 0 to 60 feet right of centerline; between stations 170 +00 ( + / -) <br />and F 12 +00 ( + / -), approximately 10 to 75 feet left of centerline; between stations G0 +00 ( + / -) <br />and G4 +00 ( + / -), approximately 10 to 75 feet right of centerline; and between stations 115 +00 <br />( + / -) and 1­110 +00 ( + / -), approximately 200 feet left of centerline to 80 feet right of centerline; <br />between stations H2O +00 ( + / -) and H30 +00 ( + / -), approximately 250 feet left of centerline to <br />50 feet right of centerline; and between stations J13 +00 ( + / -) and J18 +00 ( + / -), approximately <br />VLF Weekly Report WE 03.06.10.D.doc <br />