My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec19 <br />6�rth 8 En' ✓ir�r.mental <br />G) Material Processing <br />1) East Cresson Clay Borrow Area <br />Mobilization and set up of the soil liner fill processing plant was completed this week. <br />Processing of Soil Liner Fill material began this week. A CAT D -8 dozer, a CAT 320 excavator, a <br />CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, and process <br />the material. <br />Location <br />Week <br />(tons) <br />Cumulative <br />Comments <br />E Cresson Clay Processing <br />5,388 <br />5,388 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area com lete. <br />Total <br />5,388 <br />230,404 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />Location <br />Week <br />Y <br />Comments <br />tons <br />(tons) <br />Dump 4 LVSCF Processing <br />24,421 <br />101,248 <br />H) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Excavation for the investigation of a possible Underground Working at UG #3011 was performed <br />using a CAT 375 excavator. The area was excavated down to 25 feet below finish grade and no <br />working or voids were encountered. John Lupo, P.E. Project Sponsor, stated that there is no <br />historic evidence of a working in the area. The excavated area will be backfilled as structural fill <br />placement progresses, through this area. No additional remediation is required for this working. <br />Confirmatory drilling was performed for Underground Working #3012. A drill pattern was set out <br />by an AMEC field representative. Fourteen holes were drilled encountering three voids. An <br />approximate total of 700 feet was drilled. An AMEC representative observed the confirmatory <br />drilling constantly. It will be necessary to remediate the lower portion of the working before any <br />further drilling can be performed to the east. Temporary fill material will need to be placed over <br />the working to gain access to the east side of the working. The crown pillar will be collapsed by <br />blasting and excavated. The working will then be remediated per plan. Prior to any remediation all <br />Temporary fill will be removed <br />Confirmatory drilling was performed for Underground Working #3013. A drill pattern was set out <br />by an AMEC field representative. Thirty -five holes were drilled encountering no voids. An <br />VLF Weekly Report WE 02.13.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.