Laserfiche WebLink
ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />DEC -6 <br />DEC -7 <br />DEC -8 <br />DEC -9 <br />DEC -10 <br />DEC -11 <br />DEC -12 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Steve Rice <br />- <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />Steve Marquez <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />-Tyler <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />VLF Weekly Report WE 12.12.09.D.doc <br />