My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />Earth & Environmc <br />AMEC observed construction of the Primary Underdrain. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, and Moisture - Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue placing structural fill within the Phase 5 VLF footprint. <br />Continue processing LVSCF at the Dump 4 LVSCF Processing area <br />Continue clearing, grubbing, and stripping at the East Cresson Clay Borrow. <br />Continue construction of the soil liner fill processing plant at the East Cresson Clay Borrow. <br />Continue construction of the Primary Underdrain. <br />Continue confirmatory drilling for UG #3012 <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC &V held a Weekly Construction meeting on February 2, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Spoke with Ron Roberts concerning permeability results from soil liner fill processed at the South <br />Cresson Clay borrow. The test results showed that the soil liner fill processed recently would have to be <br />placed at +3% moisture. Samples of the remaining unprocessed material were obtained for permeability <br />testing. <br />Spoke with Tom Shepard (Projects) and Bill Newman (Ames) concerning the remaining clay at the South <br />Cresson Clay borrow. The decision was made to move the soil liner fill processing plant to the East <br />Cresson Clay borrow. <br />Ames Construction: <br />Daily Safety /Tailgate Meetings: AMEC personnel attended the Ames daily safety meeting held prior to <br />the start of shift. Discussions centered on safety and planned work activities. <br />AMEC. <br />John Lupo was onsite Wednesday (2/3/2010) to inspect encountered underground workings. John also <br />observed ongoing work activities and project progress during the site visit. <br />VLF Weekly Report WE 02.06.10.D.doc <br />