Laserfiche WebLink
amec <br />L—th K Lr— ronmunt,�l <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />JAN -17 <br />JAN -18 <br />JAN -19 <br />JAN -20 <br />JAN -21 <br />JAN -22 <br />JAN -23 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Steve Marquez <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />*Tyler Wendlandt <br />- <br />ST <br />- <br />- <br />ST <br />ST <br />- <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />VLF Weekly Report WE 01.23.10.D.doc <br />