am"ec� mental <br />Continue construction of the ADR and Crusher waterlines. <br />Continue clearing, grubbing, and stripping at the East Cresson Clay Borrow. <br />Continue construction of the Primary Underdrain. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC &V held a Weekly Construction meeting on January 19, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Spoke with CC &V, Ames, and AMEC representatives, January 19, 2010, concerning the stripping at the <br />East Cresson clay borrow. Due to frost thickness, clay material was being removed with the topsoil. The <br />process was moved and care will be taken to ensure only topsoil is being removed. Out of specification <br />LVSCF material was also discussed. Changes were made to the LVSCF processing plant and the material <br />being generated is within project specifications. <br />Ames Construction: <br />Daily Safety /Tailgate Meetings: AMEC personnel attended the Ames daily safety meeting held prior to <br />the start of shift. Discussions centered on safety and planned work activities. <br />AMEC. <br />None <br />Others: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />January 23, 2010. <br />Joseph D. Hickey, CQA Monitor Date: January 23, 2010 <br />Approved By: ��j- s� Date: 1/29/2010 <br />VLF Weekly Report WE 01.23.10.D.doc <br />