Laserfiche WebLink
amen_ <br />E -1k K Enviroi:nientai <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation not substantial throughout the week. <br />V) VLF Primary Underdrain <br />No work performed during the week. <br />VI)VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and documented ambient and fill temperatures, as well as the placement of structural fill <br />within the Phase 5 VLF fill area. <br />AMEC observed clearing, grubbing, and stripping topsoil at the East Cresson Clay Borrow. <br />AMEC observed construction of the ADR/Crushing waterlines. <br />AMEC observed confirmatory drilling at Underground Workings #3009 and #3010 constantly. <br />AMEC observed the collapsing of the crown pillar at Underground Workings #3006 and #3007 <br />constantly. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, and Moisture - Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Structural fill placement within the Phase 5 VLF footprint will continue. <br />Continue processing soil liner fill at the South Cresson Clay Processing area. <br />Continue processing LVSCF at the Dump 4 LVSCF processing area <br />Continue construction of the ADR and Crusher waterlines. <br />VLF Weekly Report WE 01.16.10.D.doc <br />