amecO vtrcnmental <br />2) Low Volume Solution Collection Fill <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D -8 <br />dozer and a CAT 980 front -end loader were used to process the material. <br />Location <br />Week <br />umulative <br />Comments <br />tons <br />(tons) <br />Dump 4 LVSCF Processing <br />32,508 <br />60,321 <br />H) ADR and Crusher Waterlines <br />Pipe trench excavation and bedding was performed throughout the week for the Crushing <br />waterline using a CAT 330 excavator and a CAT 966 front -end loader. The pipe bedding material <br />was moisture conditioned and compacted using the bucket of the CAT 330 excavator. <br />Approximately 150 linear feet of pipe trench was excavated and bedded during the week. <br />Approximately 150 linear feet of 10" HDPE pipe was installed in the Crushing waterline trench. <br />Preparations for ADR waterline tie -ins were performed throughout the week. Exposure of existing <br />waterlines was performed near stations A24 +00 ( + / -) and E22 +00 ( + / -). <br />The 10" HDPE ADR waterline was tied into the system near station A24 +00 ( + / -). <br />I) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />Confirmation drilling was performed for Underground Workings #3009 and #3010. Drill patterns <br />were established by an AMEC representative around the workings on four -foot centers, per the <br />submitted remediation plan. Forty-nine holes were drilled for a approximate total 2450 feet. Two <br />voids were encountered at the Underground Working #3010 location identifying the Kitty Lane <br />shaft. John Lupo will submit a remediation plan for these workings. <br />B) Mine Shaft /Stope Remediation <br />The exposed portion of the crown pillar at Underground Workings #3006 and #3007 was collapsed <br />using a CAT 330 excavator attached with a rock hammer. A CAT 330 excavator was then used to <br />remove them material from the working. Material in the working seamed to be loose fill from <br />previous blasting. After reviewing notes from the confirmatory drilling in the area it was decided <br />to blast the remaining portion of the crown pillar. <br />The crown pillar at Underground Working #3006 and #3007 was blasted, collapsing the pillar. The <br />workings were inspected by AMEC representatives after blasting and the decision was made to lay <br />the perimeter of the working back and place a concrete plug in the working. John Lupo will submit <br />a remediation plan the workings. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />VLF Weekly Report WE 01.16.IO.D.doc <br />