My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecO vtrcnmental <br />2) Low Volume Solution Collection Fill <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D -8 <br />dozer and a CAT 980 front -end loader were used to process the material. <br />Location <br />Week <br />umulative <br />Comments <br />tons <br />(tons) <br />Dump 4 LVSCF Processing <br />32,508 <br />60,321 <br />H) ADR and Crusher Waterlines <br />Pipe trench excavation and bedding was performed throughout the week for the Crushing <br />waterline using a CAT 330 excavator and a CAT 966 front -end loader. The pipe bedding material <br />was moisture conditioned and compacted using the bucket of the CAT 330 excavator. <br />Approximately 150 linear feet of pipe trench was excavated and bedded during the week. <br />Approximately 150 linear feet of 10" HDPE pipe was installed in the Crushing waterline trench. <br />Preparations for ADR waterline tie -ins were performed throughout the week. Exposure of existing <br />waterlines was performed near stations A24 +00 ( + / -) and E22 +00 ( + / -). <br />The 10" HDPE ADR waterline was tied into the system near station A24 +00 ( + / -). <br />I) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />Confirmation drilling was performed for Underground Workings #3009 and #3010. Drill patterns <br />were established by an AMEC representative around the workings on four -foot centers, per the <br />submitted remediation plan. Forty-nine holes were drilled for a approximate total 2450 feet. Two <br />voids were encountered at the Underground Working #3010 location identifying the Kitty Lane <br />shaft. John Lupo will submit a remediation plan for these workings. <br />B) Mine Shaft /Stope Remediation <br />The exposed portion of the crown pillar at Underground Workings #3006 and #3007 was collapsed <br />using a CAT 330 excavator attached with a rock hammer. A CAT 330 excavator was then used to <br />remove them material from the working. Material in the working seamed to be loose fill from <br />previous blasting. After reviewing notes from the confirmatory drilling in the area it was decided <br />to blast the remaining portion of the crown pillar. <br />The crown pillar at Underground Working #3006 and #3007 was blasted, collapsing the pillar. The <br />workings were inspected by AMEC representatives after blasting and the decision was made to lay <br />the perimeter of the working back and place a concrete plug in the working. John Lupo will submit <br />a remediation plan the workings. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />VLF Weekly Report WE 01.16.IO.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.