Laserfiche WebLink
ameO <br />Location <br />Week <br />tons <br />emulative <br />Comments <br />E Cresson Clay Processing <br />2,278 <br />42,676 <br />Comments <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />2,278 <br />273,080 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />Excavation of the collapsed crown pillar and temporary fill was performed at the Underground <br />Working #3012 cleaning out and discovering limits of the working. This was performed using a <br />CAT 345 excavator assisted by a CAT D -9 dozer. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />V) VLF Primary Underdrain <br />No work was performed during the week. <br />VI)VLF Geosynthetics <br />No work was performed on site during the week. <br />VLF Weekly Report WE 03.20.10.D.doc <br />Week <br />umulative <br />Location <br />Comments <br />tons <br />Dump 4 LVSCF Processing <br />15,242 <br />210,068 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />Excavation of the collapsed crown pillar and temporary fill was performed at the Underground <br />Working #3012 cleaning out and discovering limits of the working. This was performed using a <br />CAT 345 excavator assisted by a CAT D -9 dozer. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />V) VLF Primary Underdrain <br />No work was performed during the week. <br />VI)VLF Geosynthetics <br />No work was performed on site during the week. <br />VLF Weekly Report WE 03.20.10.D.doc <br />