My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame_c'®_ <br />i r i -" ironmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 20, 2010 <br />Reporting Period: 3/14/10 through 3/20/10 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />N <br />N <br />N <br />N <br />- <br />- <br />D = DaN Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 17 °F to 38 °F ( + / -) High: 32 °F to 58 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Due to snowfall and slick haul routes day and night shift operations were canceled Friday <br />(3/19/2010) and Saturday (3/20/2010). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D -8 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem -axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A19 +00 ( + / -) and <br />A22 +00 ( + / -), approximately 0 to 200 feet left of centerline; between stations A54 +00 ( + / -) <br />and A60 +00 ( + / -), approximately 50 to 100 feet right of centerline; between stations H4 +00 <br />( + / -) and H 10 +00 ( + / -), approximately 80 to 200 feet right of centerline; and between stations <br />H14 +00 ( + / -) and H31 +00 ( + / -), approximately 0 to 200 feet right of centerline. Slope <br />contouring was performed using various CAT dozers. Material generated as the cut progressed <br />was pushed down the slope. <br />VLF Weekly Report WE 03.20.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.