My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated /processed for the LOB and the VLF) <br />• Production of the SLF material continued at the clay plant throughout the week. <br />Approximately 2,500 ( + / -) tons of clay was processed throughout the week <br />based on limited information provided by the Ames. Clay tracking needs to <br />improve between day and night shifts. <br />• Ames started the setup of a second screening plant to process clay and the other <br />construction materials. Setup was not completed by the end of the week. <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• The Drillers (Rock Breakers) mobilized to site on February 4, 2009. They began <br />drilling on February 5, 2009 in the sediment collection pond to delineate the extent of <br />the underground mine workings. Drilling continued through the week ending February <br />13. Based on the driller's daily reports, approximately 1,100' (22 holes) were drilled <br />throughout the week. <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />Sheet 2 of 6 <br />VLF Weekly Report WE 02.13.09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.