ameO <br />E:.I th & En-- mental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Date: 2/17/09 Reporting Period: 02/08/09 through 02/14/09 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />- <br />- <br />N <br />N <br />N <br />- <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 12° High: 32° <br />AMEC CQA Personnel On -site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• Ames started clearing and grubbing activities along the East Perimeter Access <br />Road at Station A22 +00. Pioneer roads were started and work continued with a <br />D8 dozer and 330 excavator. <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• Ames continued to relocate the existing topsoil located near the northwest edge <br />of the Phase 5 VLF. The topsoil was being hauled to the lower stockpile north <br />of the five point intersection. <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />Sheet 1 of 6 <br />VLF Weekly Report WE 02.13.09.doc <br />