My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec,O <br />• Two AMEC Earth and Environmental representatives (Joseph Hickey and Derek Wittwer) attended <br />the weekly construction meeting at 10:00 AM. Construction progress, scheduling, and issues were <br />discussed. <br />• Site specific training was completed by both AMEC representatives. <br />I. Testing Summary <br />No testing was performed at this time. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />None noted. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />• Spoke with Thomas Sheppard concerning the week's mobilization tasks and involvement needed on- <br />site. It was understood that mobilization tasks were the week's main priority and the majority of time <br />would be spent setting up AMEC's facilities. <br />• Spoke with Tom and Ron (CC &V) concerning site activities and mobilization progress. Site <br />introductions for Alfonso Frias occurred this week. <br />Ames Construction: None <br />Amec: None <br />Others: None <br />Daily Safety/Tailgate Meetings: <br />Site specific training completed By Joe Hickey and Alfonso Frias this week. <br />Summary of Incidents /Accidents/Health & Safety Issues <br />None noted. <br />CQA Monitor: Alfonso Frias Date: 01/20/09 <br />Approved By: � �� Date: 01/23/09 <br />Sheet 3 of 4 VLF Weekly Report WE 01.17.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.