My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />...-firth K L— ronmentai <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated /processed for the LOB and the VLF) <br />• No Activities <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• No Activities <br />B. Mine Shaft /Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />0 No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />Derek Wittwer and Joe Hickey arrived on site from Denver, CO at 10:00AM on January 13, 2009. After <br />attending the weekly construction meeting a site tour was attended with Thomas Sheppard (CC &V). Site <br />mobilization, including site office, and facilities was the primary function through the week. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, January 17. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />Sheet 2 of 4 VLF Weekly Report WE 01.17.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.