Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ameO <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />1.0 INTRODUCTION <br />Cripple Creek & Victor Gold Mining Company (CC &V) operates the Cresson Project, located in <br />Teller County, Colorado, near the city of Victor. The Cresson Project is a mining and ore <br />processing and beneficiation facility that is composed of surface mines as well as a valley leach <br />facility (VLF); an adsorption, desorption, and recovery (ADR) plant; and associated <br />infrastructure, all of which were designed and constructed to meet or exceed the requirements <br />established by CRS §34 -32 -101 et seq. and regulations promulgated there under by the Mined <br />Land Reclamation Board (MLRB). <br />The work associated with the Cresson Project is being performed under specific criteria <br />established in Amendment No. 8 of Permit Number M- 1980 -244 (Permit), as approved by the <br />MLRB. This Report documents the Construction Quality Assurance (CQA) and Construction <br />Quality Control (CQC) services provided by AMEC Earth and Environmental (AMEC) from <br />March 2009 through May 2009 for the relocation of the VLF Load Out Bin (LOB). The general <br />LOB Relocation site plan is presented on Figure 1, and the LOB pad certification boundary is <br />presented on Figure 2. <br />1.1 Project Description <br />The existing Cresson Project was constructed in phases from 1994 through 2004 (Phases I <br />through IV). Phases I and II were permitted in 1994 and constructed during the 1994 through <br />1996 construction seasons. Phase III was permitted in 1999 and construction was initiated the <br />same year, with completion in 2000. Phase IV was permitted in 2000 and construction was <br />completed in 2004. Phase 5 was permitted in 2008 and is currently under construction. As part <br />of the construction activities, the LOB is being moved from its current location to a new pad <br />located to the north end of the VLF, as shown on Figure 2. <br />1.2 Construction Quality Assurance /Quality Control <br />AMEC provided CQA and CQC monitoring and testing services, and prepared this report <br />describing the monitoring and test results for the LOB relocation. As -built drawings and <br />supporting CQA and CQC monitoring and testing documentation are presented in appendices <br />attached to this report. <br />SAPROJECTS\1125E CCV CQA \H3 - CONSTRUCTION \LOB CERT REPORT\REPORT BODI1LOB CERT REPORT 2009.07.01.DOC <br />