My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-07_REPORT - M1980244 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-07-07_REPORT - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:33 PM
Creation date
2/26/2014 9:30:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/7/2009
Doc Name
QA July 7,2009: Load out Bin Relpcation Doc 1 of 7
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company , <br />Cresson Project amec <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />1.3.1 Daily Construction Summary Reports <br />AMEC prepared daily construction summary reports as well as photographic documentation <br />(Appendix A) throughout the project to document the key elements of construction and the CQA <br />activities that occurred. On -site AMEC CQA personnel, the Certifying Engineer and the Project <br />Engineers discussed construction activities on a regular basis. In addition, field personnel <br />prepared daily observation reports. AMEC submitted these daily reports and a daily summary <br />report to CC &V. Daily reports are not included in this report but were available for Colorado <br />Division of Reclamation, Mining and Safety (DRMS) review during the course of the project. <br />1.3.2 Weekly Construction Summary Reports <br />AMEC prepared weekly construction summary reports which were submitted to CC &V and to <br />the DRMS. Weekly Reports from the period of April 3rd 2009 through May 6th 2009 are <br />presented in Appendix C. <br />1.3.3 Project Specifications <br />All work was performed in accordance with the design plans and specifications in Amendment <br />No. 8 to Mining Permit M- 1980 -244 and subsequent revisions as approved by DRMS. IFC <br />Drawings are presented in the Drawings section of this report and project technical <br />specifications are presented in Appendix D. <br />1.4 Record Survey Documentation <br />Ames Construction of Aurora, Colorado provided the Record Drawings for the activities <br />associated with the LOB relocation. A Colorado Registered Land Surveyor prepared the <br />drawings. The Record Drawings prepared by Ames are presented in Appendix E. The <br />Surveyor's certificates are presented in Appendix F. Ames also provided locations for SLF <br />density tests, SLF depth checks, geomembrane panels, and destructive tests, which were used <br />by AMEC to develop test summaries and the geomembrane panel layout drawing. <br />1.5 Certification Boundary <br />Figure 2 presents the boundary of the LOB that is being certified in this report. The work <br />completed within the certification boundary included underground workings remediation; site <br />grading; subgrade preparation; SLF installation, placement and compaction; installation of 100 - <br />mil single sided texture and 80 -mil smooth LLDPE geomembrane; and DCF placement. <br />S: \PROJECTS \1125E CCV CQA \H3 - CONSTRUCTION \LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.01.DOC 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.