My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:42 PM
Creation date
2/26/2014 9:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
QA REPORT Phase 4B/C Triangle Liner Certification Aug 10, 2010
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B /C Triangle Liner Certification <br />August 10, 2010 <br />6.0 GEOSYNTHETIC CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by AMEC for the geomembrane <br />installed in the re- certified areas. <br />In accordance with the AMEC CQA Plan, when an AMEC monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Lonestar and /or CC &V. <br />When unsatisfactory test results identified a deficiency, AMEC performed additional tests to <br />define the extent of the deficient area. Lonestar corrected deficiencies to meet the requirements <br />of the specifications, and AMEC retested and /or approved the corrected deficiency prior to any <br />additional related work. The following sections include discussions of the deficiencies <br />encountered. <br />6.1 Geomembrane <br />CQA activities conducted by AMEC during the installation of the LLDPE geomembrane <br />consisted of the following: <br />■ Conformance sampling and testing of the geomembrane; <br />■ Observation and approval of the SLF surface prior to deployment of geomembrane; <br />■ Observation and documentation of geomembrane deployment, including verifying sheet <br />thickness and overlap and documenting panel layout; <br />■ Observation of trial seam sample testing and documentation of results; <br />■ Observation and documentation of field seaming; <br />■ Identification of destructive seam sample test locations, observation of destructive seam <br />sample testing, and documentation of test results; <br />■ Observation and documentation of geomembrane repairs; and, <br />■ Observation and documentation of non - destructive pressure testing of fusion seams and <br />vacuum testing of extrusion seams and repairs. <br />The following sections present a detailed description of each of the above activities. <br />S \PROJECTS \1125E CCV CQA \H2 - DESIGN \TRIANGLE \FINAL \TRIANGLE CERTIFICATION REPORT FINAL REV1 DOC 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.