Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B /C Triangle Liner Certification <br />August 10, 2010 <br />or exceeded project specifications. The geomembrane roll CQC certificates are presented in <br />Appendix G -4. <br />5.2.3 Welding Rod CQC Certificates <br />Welding rod certification consisted of resin CQC documents for the resin used to manufacture <br />the welding material for the Cresson Project. AMEC's review of the CQC certification indicates <br />that the resin used to manufacture the welding material met project specifications. The welding <br />rod CQC certificates are presented in Appendix G -5. <br />S \PROJECTS \1125E CCV CQA \H2 - DESIGN \TRIANGLE \FINAL \TRIANGLE CERTIFICATION REPORT FINAL REV1 DOC 14 <br />