Laserfiche WebLink
October 2001 -10- 003-2182.004 <br /> 2.5 Leak Detection Collection Recovery System <br /> The Leak Detection Collection Recovery System (LDCRS) is comprised of the geonet <br /> drainage layer,the Leak Detection Fill in the sump area, and the Leak Detection pipe. <br /> Ames excavated the sump, and placed approximately 25 cubic yards of Leak Detection Fill and <br /> approximately 20 cubic yards of Pipe Bedding Fill. <br /> 2.6 Non-Structural Fill Placement <br /> Non-structural Fill was placed on the downstream side of the northern fill slope (outside the <br /> pond) to create an access road. This non-structural fill was placed in addition to structural fill <br /> shown on the IFC drawings. As-constructed drawings showing this additional fill are located <br /> in Appendix A. Non-structural fill was compacted using equipment travel only, and is not a <br /> structural component of the embankment. <br /> [\00\2182\EXTERNAL POND RPT\PINALDOC Golder Associates <br />