My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2001-10-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 1:56:35 PM
Creation date
2/25/2014 5:46:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/25/2001
Doc Name
Final Report QA Oct 2001for "External Pond" Doc 1 of 10
From
CC&V
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2001 -4- 003-2182.004 <br /> ► Golder observed and documented geomembrane deployment, trial seams, <br /> seaming, destructive testing, and non-destructive testing (pressure tests <br /> and vacuum tests); <br /> ► Golder performed conformance testing of geomembrane; <br /> ► Golder performed conformance testing of geonet; <br /> ► Golder measured geomembrane panel thickness and confirmed adequate <br /> panel overlap; <br /> ► Golder visually inspected geomembrane sheet quality, sheet grinding,seam alignment, and continuity; <br /> ► Golder visually inspected geonet sheet quality; and <br /> ► Golder retained archive samples of geomembrane destructive tests and <br /> trial seams. <br /> 1.3 Project Coordination <br /> All Golder CQC and CQA activities were directed by Mr. Robert Nichols, the Golder Resident <br /> Engineer. The Certifying Engineer, Mr. John F. Lupo, Ph.D., P.E., or his representatives <br /> (including Mr. Greg Eddy, P.E., Project Engineer, and Mr. James M. Johnson, P.E., Principal) <br /> made periodic site visits to resolve outstanding issues and to review Golder activities. <br /> Appendix C presents a summary of the Golder staff on-site during the period of November <br /> 2000 through September 2001. <br /> Representatives of CC&V, Ames, Poly-Flex, and Golder conducted daily and weekly <br /> construction coordination meetings throughout the construction period. <br /> 1.3.1 Daily Construction Summary Reports <br /> Golder prepared daily construction summary reports as well as photographic documentation <br /> throughout the project to document the key elements of construction and the CQA activities that <br /> I\00\2182\EXTERNAL POND RPT\PINALDOC Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.