Laserfiche WebLink
(STELE ROSE ONE,Inc.) <br /> 110(2)Limited Impact Operations <br /> Mine(M-2006-31) <br /> shall include the relevant information specified in Mineral Rule 3.1.13. <br /> f) See Exhibit C Appendix B(maps). See also Exhibit E—Map. <br /> g) No new roads are anticipated. FS226 and the existing access road are the only <br /> roads on the claim. Any road improvements shall be done to Forest Service <br /> standards. The existing access road is part of the proposed permitted acreage and <br /> shall be reclaimed. <br /> h) No water(except drinking water)shall be used in conjunction with this proposed <br /> operation. <br /> i) No groundwater or surface water shall be disturbed in this operation. <br /> j) N/A;no water used or onsite. <br /> k) If refuse or acid producing materials are encountered onsite(e.g. sulfides), such <br /> materials shall be completely removed and sent offsite for appropriate processing <br /> and/or disposal. The DMG shall be notified if refuse or acid pro ducing materials <br /> are encountered onsite. <br /> Note on Sulfides: No sulfides have been encountered to date in either the <br /> existing pit or piles. These features have existed for at least 10 years; also <br /> significant quantities of calcite and other basic minerals have been found during <br /> exploration. Water from the bottom of the pit repeatedly tests as neutral or <br /> slightly basic(pH 7-7.5). Our processors require notification of the presence of <br /> sulfides as sulfide ores require different processes. Repeated testing for the <br /> presence of sulfides and sulfates haven't found any. Field testing for sulfate uses <br /> a few drops of barium sulfate aqueous solution on supernatant from crushed <br /> sample/water,sulfide testing involves heating a small amount of crushed sample <br /> and testing for sulfur dioxide with a Draeger tube or test paper. Field testing is <br /> done on all ore by our Technical Director,a qualified chemist. <br /> 1) The following measures shall be taken on an ongoing basis to minimise <br /> disturbance to the hydrologic balance,prevent off-site damage,and provide for a <br /> stable configuration of the reclaimed area consistent with the proposed future land <br /> use: <br /> Refilling all pits and trenches; <br /> Recontouring the slope to a natural setting; <br /> Replacing available topsoil; <br /> Seeding topsoil piles with FS approved mix and monitoring all piles for <br /> erosion problems. <br /> m) As the ore bodies lies from one to fifteen feet below the surface, and differs <br /> from topsoil or overburden both in color and density,separation is accomplished <br /> by removing and stockpiling overburden and topsoil for backfill. Subsequently <br /> the ore is separately removed and shipped off site. The Steel Rose 1,Inc. <br /> specifies that no processing of ore shall take place on site. <br /> n) Gold, Silver for sale. <br /> o) No explosives shall be used. <br /> 6.3.3(2) <br /> No tailing ponds are part of the project N/A <br /> Page 9 of 11 <br />