Laserfiche WebLink
B. Water Quality. State how applicable state and federal water quality standards will be met. <br /> Describe measures or management practices to be used to minimize water quality impacts and <br /> meet applicable standards. <br /> 1. State whether water is to be used in the operation, and describe the quantity, source, methods <br /> and design of diversions, storage, use, disposal, and treat nent facilities. Include assumptions <br /> for sizing water conveyance or storage facilities. <br /> 2. Describe methods to control erosion and surface water runoff from all disturbed areas, <br /> including waste and tailings dumps. <br /> 3. Describe proposed surface water and groundwater quality monitoring, if required, to <br /> demonstrate compliance with federal or state water quality standards. <br /> 4. Describe the measures to be used to minimize potential water quality impacts during seasonal <br /> closures, or for a temporary cessation of operations. <br /> 5. If land application is proposed for waste water disposal, the location and operation of the <br /> land application system must be described. Also describe how vegetation, soil, and surface and <br /> groundwater r quality will be protected if land application is used. <br /> No water on site. No production on site. Eiiiav an anly. No water is used in apwdion. only driwdng water for workers. <br /> Maftial disturbances we contoured to tmwA no surface water present <br /> (1) Top sail will be stockpiled sgmldy. <br /> (2) Seeding stocgiles vndi native species listed in the Forest Service approved seed mix,and/or manitomg stockpiles for <br /> erosion problems. <br /> C. Solid Wastes. Describe the quantity and the physical and chemical characteristics of solid waste <br /> produced by the operation Describe how the wastes will be disposed of including location and <br /> design of facilities, or treated so as to minimize adverse impacts. <br /> No production on site. Excavation only NO Waste offier that workers using cafltoles. <br /> D. Scenic Values. Describe protection of scenic values such as screening, slash disposal, or timely <br /> reclamation <br /> Pit will be reclaimed anuually to protect scenic value;in addition to ccutioual big to minimize the total disturbance <br /> size. <br /> (1) Refilling all pits and trenches. <br /> (2) Recaulaouring Ste slope to a natural setting <br /> (3) Replacing available topsoil. <br /> (4) Seeding stockpiles whit native species listed in die Forest Service approved seed mix,and/or moan oring stockpiles for <br /> mnsion proMems. <br /> Qf ne a spa=is nee W to fn a*a blot*of o#Wmafion,we ad&wxd ske&*and s#&*farxO <br />