My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-20_REVISION - M2006031
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006031
>
2014-02-20_REVISION - M2006031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:07 PM
Creation date
2/21/2014 9:45:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006031
IBM Index Class Name
Revision
Doc Date
2/20/2014
Doc Name
Application AM01
From
Operator
To
DRMS
Type & Sequence
AM1
Email Name
TAK
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Project Description. Describe all aspects of the operation including mining, milling, and <br /> exploration methods, materials, equipment, workforce, construction and operation schedule, power <br /> requirements, how clearing will be accomplished, topsoil stockpile, waste rock placement, tailings <br /> disposal, proposed number of drillholes and depth, depth of proposed suction dredging, and how <br /> gravels will be replaced, etc. Calculate production rates Of ore. Include justification and <br /> calculations for settling pond capacities, and the size of runoff diversion channels. <br /> ftiect will be wpm won operation within existing sine and NO consauctian. We will only dig m praise grass with <br /> rubber tired backhoe.,and tandem track. We will only be esca =g for known rock within the existing hole previously <br /> authorized in existing plan of operatan. All other material will be moved to edge of pit far reclamation.We will be <br /> b8cUllm9 as we go having only one pit open a any time. The pit and any rtckpiles will be flagged with caution tape. <br /> (1) Top soil will be stockpiled seperatly. <br /> (2) Seeding stockpiles with native species listed m the Forest Service approved seed roux,andlor monitoring aoc pft for <br /> erosion problems. <br /> (3) Annual reclamation will be completed by December 31 of each year or as directed by the Forest Service. <br /> Work crew will include a maximum of 8 and they will be working for no more then 10 days ofthe month,for a total of 120 <br /> days per Year Hours of digging will range from lam till dusk for no more the 5hrs per day. Other than 4,S-gallon gasoline <br /> -- containers tin the bed of the truck,there will be no other hazardous materials. Tho _ps containers will be held in a <br /> s�oiage � ii tr�ba" We vvifflhave*ill pails far refilling,but s6uld a gas spill occare we <br /> will remove all areas with shovels and remove dirt off sight fear desposal. For all human west we will use cattales <br /> "leave no trace"guidlmes. All trash will be removed and disposed of cff sight. There will be no paver or water <br /> requirements since this is an organic process of precious metals recovery and this recovery will be done off sight. The Dig.. <br /> sight will be 950 ft long X80 ft wide X"ft deep. Expanding an additAna118 ft deep. There is a 150 ft of access rd. We <br /> Will puH out the remainder of the proviWy autarized Exploration pilot weight of 200 toms.. This leaves appwmtamly 190 <br /> tons to ove. The production ore are precious ton of <br /> �. <br /> J•, S 6s <br /> D. Equipment and Vehtclea. Deicrib6 that which is prop6sed for use in your operation(ExaVles: <br /> drill, dozer,wash plant,mill, etc.). Include: sizes, capacity, frequency of use,etc. <br /> AV 'AV' e X <br /> Bobcat and rubbed ' for excavating material. T6d&iiTrack with 10 ton capacity fer hauling off matMial twice a <br /> wade. Haas of digging will range from lam till dusk <br /> E. Structures. Include information about fixed or portable structures or facilities planned for the <br /> operation. Show locations on the map. Include such things as living quarters,storage sheds, mill <br /> buildings,thickener tanks, fuel storage,powder magazines,pipelines,water diversions,trailers, <br /> sanitation facilities including sewage disposal, etc. Include engineering design and geotwbrAcal <br /> information for project facilities,justification and calculations for sizing of tanks, pipelines and <br /> water diversions, etc. <br /> No Structures planned None N/A <br /> A- Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a <br /> burning permit for slash disposal or dust abatement on roads. <br /> We will only be doing escavition. �T burning will occure.No impact on Air Qulaity. Waridng with all standards of EPA <br /> and USFS and BLM. <br /> (Tfnem+e space a seeded t#JVt oW a block 4 wmaaox5 me admWwA l skeers end aftaeh jo m) <br />
The URL can be used to link to this page
Your browser does not support the video tag.