Laserfiche WebLink
5 <br />3 <br />k <br />1 i <br />ATTACHMENT A <br />AMEC - 2014 . COA Field Staff Schedule MLE2 <br />Nam <br />Feb 2 <br />Feb 3 <br />-b4 <br />Feb 5 <br />Feb G <br />Feb 7 <br />Feb 8 <br />Tim Burkhard <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Steve Rice <br />- <br />- <br />UG <br />UG <br />UG <br />UG <br />- <br />Ben Melly <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />- <br />UG <br />UG <br />UG <br />UG <br />UG <br />- <br />T ler Browning <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />Eric Lorenson <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Razi Molloy <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Andrea Meduna <br />SE <br />Mike Nelson I <br />J-- <br />PM <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />RECEIVED <br />FEB 2 0 2014 <br />Division of Reclamation, <br />Mining & Safety <br />Pa«e 4 of 6 MLE2 VVE 08Feb] 4.doc <br />