Laserfiche WebLink
Cict <br />&V <br />amee-" <br />used to remove timber panels form the historic crib wall that were fastened together with steel backing straps and <br />spikes. <br />Timber -panel installation continued at the South MSE wall. <br />H) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation (snow removal and runoff from melting snow and ice). <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation and drilling; <br />Production drilling and blasting; Timber panel and tailing removal at the historic Crib Wall; Timber panel installation at <br />the South MSE Wall; and Clay Soil Liner Fill —(SLF) and Drain Cover Fill (DCF) processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution; Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />DCF: Sample 52 and 53 were collected and returned to Amec's laboratory for analysis. <br />SLF Sample Number 98 -S through 102 -S were collected and returned to Amec's laboratory for analysis. <br />General Proiect Items <br />Meetings and Discussions: The Contractor Meeting occurred on February 5, 2014 with CC &V Projects, Amec, and Ames. <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None. <br />Deliveries: None <br />Submitted by: Eric Lorenson Date 08 Feb 2014 <br />CQA Monitor <br />Reviewed By: <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved Br: <br />CC &V Projects <br />Date: <br />Date. ;2 – /`f <br />Page 3 of 6 MLE2 WE 08Febt 4. doc <br />