My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-18_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2014-02-18_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:50:52 PM
Creation date
2/19/2014 7:24:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
2/18/2014
From
New Elk Coal Company
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Hydrology Report
Email Name
LDS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 2014 Page 1 -5 <br />Table 1 -1. Hydrologic Monitoring Requirements for New Elk Mine <br />Site <br />Water Level <br />or Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NPDES List <br />PRS -1 <br />S <br />S <br />A <br />Q <br />PRS -4 (aka NE 080) <br />S <br />S <br />A <br />Q <br />TH -201 <br />Q <br />Q <br />Q <br />NM -21 <br />TH -202 <br />Q <br />Q <br />NM 22 <br />Q <br />TH -203 <br />Q <br />NM 23 <br />Q <br />Q <br />PAW -1 <br />S <br />S <br />A <br />Q <br />PAW -2 <br />S <br />S <br />A <br />PAW -8 <br />S <br />S <br />A <br />PAW -9 <br />S <br />S <br />A <br />NEW -2 <br />S <br />A <br />A <br />NEW -3 <br />S <br />NEW -4 <br />S <br />A <br />A <br />NPDES Stations <br />+ <br />+ <br />NE -001 Mine water <br />+ <br />+ <br />NE -004 (Pond 4) <br />+ <br />+ <br />NE -007 (Pond 7) <br />+ <br />+ <br />NE -008 (Pond 8) <br />+ <br />+ <br />NE -080 (PRS -4) <br />+ <br />+ <br />KEY <br />S= Semi - annual] (second and fourth quarters) <br />A= Annuall (fourth quarter) <br />Q= Quarterl (quarterly refuse pile inspections) <br />+ =See NPDES Permit for frequency and required analysis <br />The final approval of PR -02 occurred on September 27, 2011. PR -02 added the <br />following eight bedrock monitoring wells to the hydrologic monitoring requirements for the <br />mine. NECC did not monitor the eight wells during 2012. NECC plans to initiate monitoring of <br />the wells during the first quarter of 2013. <br />Site <br />Water Level or <br />Flow <br />Field <br />Measurements <br />Laboratory <br />Analysis <br />NE -1 -10 Allen <br />Q <br />Q <br />Q <br />NE-6-1 Oa Apache <br />Q <br />Q <br />Q <br />NE -6 -IOb Blue <br />Q <br />Q <br />Q <br />NM -20 <br />Q <br />Q <br />Q <br />NM -21 <br />Q <br />Q <br />Q <br />NM 22 <br />Q <br />Q <br />Q <br />NM 23 <br />Q <br />Q <br />Q <br />SF -2 <br />Q <br />Q <br />Q <br />1. 2.3 Ponds and Direct Discharges <br />
The URL can be used to link to this page
Your browser does not support the video tag.