My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-13_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2014-02-13_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:58 PM
Creation date
2/14/2014 1:45:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
2/13/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
Bishop Brogden Associates, Inc.
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br />Transit Mix of Pueblo, Inc. - East Pit Phase 7 <br />Projected Depletion Analysis (February 2014 - January 2016) <br />[ I J Phase 7 of the Pueblo East Pit has approximately 5 0 acres o(exposed water surface area <br />(2J Gross Evaporation Rate equals 4 17 feet per year, based upon NOAA Evaporation Atlas Monthly distribution based upon SB -120 Guidelines <br />[3] Gross Evaporation cquals [ I ] x (2J <br />[4] E(fecuve Prccipnation Rate cquals 70 %of total precipitation, based upon NOAA Pueblo Memorial Airport weather station <br />[5) Effective Preciprtauon Credit is not claimed in Phase 7 <br />(61 Average monthly potential consumptive use in Blaney- Cnddle analyses for Phase 7 based on a depth to ground water of-4 feet Values limited on monthly basis to gross evaporation in [2] <br />(7f Phreatophyte Reduction Credit equals (6] x 5 0 ac, based upon 5 0 acres of 100 -a canopy cover <br />8J Total natural vegetation credit equals [5] - [71 <br />1[[ 9J Pond Evaporanon Replacement Requirement equals [3] - [8] <br />10J Annual production hmued to 1,000,000 tons, or 29 4 ac -R of depletions from 4 9,t water content by weight of the mined aggregate removed from Phase 7 The monthly distribution is based upon past operating <br />pattems The actual monthly rate may vary as long as the annual amount is not exceeded <br />[11 ] Phase 7 replacement requirement equals pond evaporation depiction plus water loss with aggregate removal [9] - (10] <br />�„It IL-- BBA <br />Surface Area <br />Total <br />Natural <br />Vegetation Credit <br />Pond <br />Aggregate Total <br />of Exposed <br />Gross Gross <br />Effective Effective <br />Phreatophyie Phreatophyte <br />Total Natural <br />Evaporation <br />Moisture Replacement <br />Ground Water <br />Evaporation Evaporation <br />Precipitation Precipitation <br />CU Reduction <br />Vegetation <br />Replacement <br />Content Depletion Requirement <br />(ac) <br />Rate (it) (ac-ft) <br />Rate (0) Credit (re-fl) <br />(f) Credit (ac-11) <br />Credit (—f) <br />Requirement (ac -ft) <br />(ac -ft) (ac -0) <br />Month <br />111 <br />121 3 <br />4 5 1 <br />161 7 <br />8 1 <br />191 <br />1101 II <br />Feb -14 <br />50 <br />015 075 <br />002 000 <br />000 000 <br />000 <br />075 <br />177 252 <br />Mar -14 <br />50 <br />023 115 <br />005 000 <br />007 036 <br />036 <br />079 <br />235 314 <br />Apr -14 <br />50 <br />038 190 <br />007 000 <br />038 190 <br />190 <br />000 <br />235 235 <br />May -14 <br />50 <br />050 250 <br />009 000 <br />050 250 <br />250 <br />000 <br />235 235 <br />Jun -14 <br />50 <br />060 300 <br />008 000 <br />060 300 <br />300 <br />000 <br />294 294 <br />Jul -14 <br />50 <br />063 315 <br />011 000 <br />063 315 <br />315 <br />000 <br />294 294 <br />Aug -14 <br />50 <br />056 280 <br />012 000 <br />056 280 <br />280 <br />000 <br />294 294 <br />Scp -14 <br />50 <br />042 210 <br />005 000 <br />042 210 <br />210 <br />000 <br />294 294 <br />Oct -14 <br />50 <br />029 145 <br />004 000 <br />029 145 <br />145 <br />000 <br />294 294 <br />Nov -14 <br />50 <br />017 085 <br />003 000 <br />004 022 <br />022 <br />063 <br />235 298 <br />Dec -14 <br />50 <br />013 065 <br />002 000 <br />000 000 <br />000 <br />065 <br />177 242 <br />Jan -15 <br />50 <br />013 065 <br />002 000 <br />000 000 <br />000 <br />065 <br />177 242 <br />Feb -15 <br />50 <br />015 075 <br />002 000 <br />000 000 <br />000 <br />075 <br />177 252 <br />Mar -15 <br />50 <br />023 115 <br />005 000 <br />007 036 <br />036 <br />079 <br />235 314 <br />Apr -15 <br />50 <br />038 190 <br />007 000 <br />038 190 <br />190 <br />000 <br />235 235 <br />May -15 <br />50 <br />050 250 <br />009 000 <br />050 250 <br />250 <br />000 <br />235 235 <br />Jun -15 <br />50 <br />060 300 <br />008 000 <br />060 300 <br />300 <br />000 <br />294 294 <br />Jul -15 <br />50 <br />063 315 <br />011 000 <br />063 315 <br />315 <br />000 <br />294 294 <br />Aug -15 <br />so <br />056 280 <br />0 12 000 <br />0 56 280 <br />280 <br />000 <br />294 294 <br />Sep -15 <br />50 <br />042 210 <br />005 000 <br />042 210 <br />210 <br />000 <br />294 294 <br />Oc1-15 <br />50 <br />029 145 <br />004 000 <br />029 145 <br />145 <br />000 <br />294 294 <br />Nov. 15 <br />50 <br />017 085 <br />003 000 <br />004 022 <br />022 <br />063 <br />235 298 <br />Dee -15 <br />50 <br />013 065 <br />002 000 <br />000 000 <br />000 <br />065 <br />177 242 <br />Jan -16 <br />50 <br />013 065 <br />002 000 <br />000 000 <br />00'3' <br />065 <br />177 242 <br />2014 Total <br />4 17 21 0 <br />0 69 0 0 <br />3 50 17 5 <br />17 <br />3 5 <br />29 4 32 9 <br />2015 Total <br />4 17 21 0 <br />069 00 <br />350 175 <br />17 5 <br />15 <br />29 4 32 9 <br />[ I J Phase 7 of the Pueblo East Pit has approximately 5 0 acres o(exposed water surface area <br />(2J Gross Evaporation Rate equals 4 17 feet per year, based upon NOAA Evaporation Atlas Monthly distribution based upon SB -120 Guidelines <br />[3] Gross Evaporation cquals [ I ] x (2J <br />[4] E(fecuve Prccipnation Rate cquals 70 %of total precipitation, based upon NOAA Pueblo Memorial Airport weather station <br />[5) Effective Preciprtauon Credit is not claimed in Phase 7 <br />(61 Average monthly potential consumptive use in Blaney- Cnddle analyses for Phase 7 based on a depth to ground water of-4 feet Values limited on monthly basis to gross evaporation in [2] <br />(7f Phreatophyte Reduction Credit equals (6] x 5 0 ac, based upon 5 0 acres of 100 -a canopy cover <br />8J Total natural vegetation credit equals [5] - [71 <br />1[[ 9J Pond Evaporanon Replacement Requirement equals [3] - [8] <br />10J Annual production hmued to 1,000,000 tons, or 29 4 ac -R of depletions from 4 9,t water content by weight of the mined aggregate removed from Phase 7 The monthly distribution is based upon past operating <br />pattems The actual monthly rate may vary as long as the annual amount is not exceeded <br />[11 ] Phase 7 replacement requirement equals pond evaporation depiction plus water loss with aggregate removal [9] - (10] <br />�„It IL-- BBA <br />
The URL can be used to link to this page
Your browser does not support the video tag.