My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-13_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2014-02-13_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:58 PM
Creation date
2/14/2014 1:45:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
2/13/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
Bishop Brogden Associates, Inc.
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Transit Mix of Pueblo, Inc. - East Pit Phase 2 <br />Projected Depletion Analysis (February 2014 - January 2016) <br />[ 1 ] Phase 2 of the Poch to East Pn has approximately 0 2 acres of exposed ground water surface area <br />[21 Gross Evaporanon Rate equals 4 17 feet per year, based upon NOAA Evaporanon Atlas Monthly distribution based upon SB -120 Guidelines <br />[31 Gros Evaporati on equate [ I ] x [2) <br />[41 Effective Piecipuanon Rate equals 70 %of total precipitation, based upon NOAA Pueblo Memorial Airport weather station <br />[51 Effectivc Precipitation Credit equals [4] x [11 <br />[61 Phreatophyte Reduction Credit is not claimed in Phase 2 <br />[7] Phreatophyte Reduction Credit is not claimed in Phase 2 <br />[91 Total natural vegetation credit equals [51 + [7] <br />[9) Pond Evaporation Replacement Requirement equals [3) - [81 <br />[10) Mining w largely finished in Phase 2 Any mining that occurs during the period of this SWSP will include a 4% depletion from water in the mined product <br />[111 Phase 2 replacement requirement equals pond evaporation depletion plus water loss with aggregate removal [9] + [I0] <br />�/'t� <br />13 BA „< <br />Surface Area <br />Total <br />Natural Vegetation Credit <br />Pond <br />Total <br />Effective Effective <br />Phreatophyte Phreatophyie <br />Total Natural <br />of Exposed <br />Goss Gross <br />Evaporation <br />Replacement <br />Ground Water <br />Evaporation Evaporation <br />Precipitation Precipitation <br />CU Reduction <br />Vegetation <br />Replacement <br />Requirement <br />(ac) <br />Rate (A) (ac -ft) <br />Rate (ft) Credit (ac -ft) <br />(ft) Credit (ac -fl) <br />Credit (ac -ft) <br />Requirement (ac -ft) <br />(ac -ft) <br />Month <br />Ill <br />[21 3 <br />4 5 <br />6 1 [71 <br />181 <br />9 <br />10 <br />Fcb -14 <br />02 <br />0 15 003 <br />002 000 <br />- 000 <br />000 <br />003 <br />003 <br />Mar -14 <br />02 <br />023 005 <br />005 001 <br />- 000 <br />001 <br />004 <br />004 <br />Apr 14 <br />02 <br />038 008 <br />007 001 <br />- 000 <br />(101 <br />006 <br />006 <br />May -14 <br />02 <br />050 0 10 <br />009 002 <br />- 000 <br />002 <br />008 <br />008 <br />Jun -14 <br />02 <br />060 0 12 <br />008 002 <br />- 000 <br />002 <br />0 10 <br />0 10 <br />Jul -14 <br />02 <br />063 013 <br />011 002 <br />- 000 <br />002 <br />010 <br />010 <br />Aug -14 <br />02 <br />056 0 11 <br />0 12 002 <br />- 000 <br />002 <br />009 <br />009 <br />Sep -14 <br />02 <br />042 008 <br />005 001 <br />- 000 <br />001 <br />007 <br />007 <br />Oct -14 <br />02 <br />029 006 <br />004 001 <br />- 000 <br />001 <br />005 <br />005 <br />Nov -14 <br />02 <br />017 003 <br />003 001 <br />- 000 <br />001 <br />003 <br />003 <br />Dec -14 <br />02 <br />0 13 003 <br />002 000 <br />- 000 <br />000 <br />002 <br />002 <br />Jan -15 <br />02 <br />0 13 003 <br />002 000 <br />000 <br />000 <br />002 <br />002 <br />Feb -15 <br />02 <br />0 15 003 <br />002 000 <br />- 000 <br />000 <br />003 <br />003 <br />Mar -15 <br />02 <br />023 005 <br />005 001 <br />- 000 <br />001 <br />004 <br />004 <br />Apr-15 <br />02 <br />038 008 <br />007 001 <br />- 000 <br />001 <br />006 <br />006 <br />May -15 <br />02 <br />050 0 10 <br />009 002 <br />- 000 <br />002 <br />008 <br />008 <br />Jun -15 <br />02 <br />060 012 <br />008 002 <br />- 000 <br />002 <br />010 <br />010 <br />Jul -15 <br />02 <br />063 013 <br />011 002 <br />- 000 <br />002 <br />010 <br />010 <br />Aug -15 <br />02 <br />056 011 <br />012 002 <br />- 000 <br />002 <br />009 <br />009 <br />Sep -15 <br />02 <br />042 008 <br />005 001 <br />- 000 <br />001 <br />007 <br />007 <br />Oct -15 <br />02 <br />029 006 <br />004 001 <br />- 000 <br />001 <br />005 <br />005 <br />Nov -15 <br />02 <br />017 003 <br />003 001 <br />- 000 <br />001 <br />003 <br />003 <br />Dcc -15 <br />02 <br />0 13 003 <br />002 000 <br />- 000 <br />000 <br />002 <br />002 <br />Jan-16 <br />02 <br />0 13 003 <br />002 000 <br />000 <br />000 <br />0 02 <br />002 <br />2014 Total <br />4 17 08 <br />069 0 1 <br />0 °,5 00 <br />0 1 <br />0 7 <br />0 7 <br />2015 Total <br />4 17 08 <br />1 069 0 1 <br />0% 00 <br />0 1 <br />07 <br />0 7 <br />[ 1 ] Phase 2 of the Poch to East Pn has approximately 0 2 acres of exposed ground water surface area <br />[21 Gross Evaporanon Rate equals 4 17 feet per year, based upon NOAA Evaporanon Atlas Monthly distribution based upon SB -120 Guidelines <br />[31 Gros Evaporati on equate [ I ] x [2) <br />[41 Effective Piecipuanon Rate equals 70 %of total precipitation, based upon NOAA Pueblo Memorial Airport weather station <br />[51 Effectivc Precipitation Credit equals [4] x [11 <br />[61 Phreatophyte Reduction Credit is not claimed in Phase 2 <br />[7] Phreatophyte Reduction Credit is not claimed in Phase 2 <br />[91 Total natural vegetation credit equals [51 + [7] <br />[9) Pond Evaporation Replacement Requirement equals [3) - [81 <br />[10) Mining w largely finished in Phase 2 Any mining that occurs during the period of this SWSP will include a 4% depletion from water in the mined product <br />[111 Phase 2 replacement requirement equals pond evaporation depletion plus water loss with aggregate removal [9] + [I0] <br />�/'t� <br />13 BA „< <br />
The URL can be used to link to this page
Your browser does not support the video tag.