Laserfiche WebLink
Table 513 <br />Transit Mix of Pueblo, Inc. - East Pit <br />Projected Depletions, Credits, and Releases (February 2014 - January 2016) <br />Scenario B - Net Excess Ditch Credit Available to Transit Mix <br />(all values in acre -feet) <br />Notes <br />(I ] Net dcplc0on from evaporation, mined material and dust control at East Pit, equal to Cal [ 12] in Table 1 <br />[2] Hamp -Bell Duch credits available to Transit Mix and provided by PB W W Once PB W W has the right to store the Hamp -Bell Ditch credits, <br />Transit Mix no longer has to replace the winter time return flow obligation and is only entitled to the net excess credit after full augmentation <br />of Chain of lake depletions (determined per Case No 03CW8) and replacement of winter nine delayed return Bows Transit loss may be <br />assessed as indicated by the Water Commissioner or Division Engineer <br />[3] Required additional storage delivery equals [ I ] - [2] <br />[4J Pueblo Reservoir release equals [3] I 0 98 The 0 98 reflects a 2% transit loss to the East Pit Maximum lease is for 120 ac -ft delivered per <br />year Water will come from either Pueblo Reservoir or Clear Creek Reservoir <br />[5] Clear Creek Reservoir release equals [4] divided by 0 90, based upon a 10% transit loss to reach Pueblo Reservoir <br />[6] Backup water release required from Twin Lakes Reservoir equals remaining replacement requirements that are not met by the Hamp -Bell <br />credits and the Pueblo lease Transit losses are included and estimated to be the same as from Clear Creek Reservoir No Twin Lakes <br />Reservoir water is projected to be required for this SWSP <br />Replacement <br />Required <br />Water Required From <br />Pueblo Lease <br />Back Up Water <br />Pueblo <br />Clear Creek <br />by Additional <br />Release Required <br />Net <br />Hamp -Bell <br />Storage <br />Rest —, <br />Reservoir <br />From Twin Lakes <br />Depletion <br />Ditch Credit <br />Deb,cry <br />Release <br />Release <br />Reservmr <br />Month <br />fli <br />[2] <br />3 <br />4 1 <br />151 <br />f6j <br />Feb -14 <br />631 <br />631 <br />000 <br />000 <br />000 <br />000 <br />Mar -14 <br />759 <br />369 <br />390 <br />398 <br />442 <br />000 <br />Apr -14 <br />7 28 <br />000 <br />728 <br />742 <br />8 25 <br />000 <br />May -14 <br />844 <br />000 <br />844 <br />861 <br />957 <br />000 <br />Jun -14 <br />1095 <br />000 <br />1095 <br />1118 <br />1242 <br />000 <br />Jul -14 <br />1087 <br />000 <br />1087 <br />1109 <br />1232 <br />000 <br />Aug -14 <br />999 <br />000 <br />999 <br />10 19 <br />11 32 <br />000 <br />Scp -14 <br />928 <br />000 <br />928 <br />947 <br />1052 <br />000 <br />Oct -14 <br />786 <br />000 <br />786 <br />802 <br />892 <br />000 <br />Nos -14 <br />679 <br />000 <br />679 <br />693 <br />770 <br />000 <br />Dec -14 <br />5 85 <br />000 <br />5 85 <br />5 97 <br />6 63 <br />000 <br />Jan -15 <br />587 <br />000 <br />587 <br />599 <br />665 <br />000 <br />Feb -15 <br />631 <br />631 <br />000 <br />000 <br />000 <br />000 <br />Mar -15 <br />7 59 <br />3 69 <br />3 90 <br />398 <br />442 <br />000 <br />Apr -15 <br />7 28 <br />000 <br />7 28 <br />7 42 <br />8 25 <br />000 <br />May -15 <br />844 <br />000 <br />844 <br />861 <br />957 <br />000 <br />Jun -15 <br />1095 <br />000 <br />1095 <br />11 i8 <br />1242 <br />000 <br />Jul -15 <br />1087 <br />000 <br />1087 <br />1109 <br />1232 <br />000 <br />Aug -15 <br />999 <br />000 <br />999 <br />10 19 <br />11 32 <br />000 <br />Sep -15 <br />9 28 <br />000 <br />929 <br />947 <br />10 52 <br />000 <br />Oct -15 <br />786 <br />000 <br />786 <br />802 <br />892 <br />000 <br />Nov -15 <br />679 <br />000 <br />679 <br />693 <br />770 <br />000 <br />Dec -15 <br />585 <br />000 <br />585 <br />597 <br />663 <br />000 <br />Jan -16 <br />587 <br />000 <br />587 <br />599 <br />665 <br />000 <br />2014 Total <br />97 I <br />100 <br />87 1 <br />88 8 <br />98 7 <br />0 0 <br />2015 Total <br />97 I <br />100 <br />87 1 <br />88 8 <br />98 7 <br />0 0 <br />Notes <br />(I ] Net dcplc0on from evaporation, mined material and dust control at East Pit, equal to Cal [ 12] in Table 1 <br />[2] Hamp -Bell Duch credits available to Transit Mix and provided by PB W W Once PB W W has the right to store the Hamp -Bell Ditch credits, <br />Transit Mix no longer has to replace the winter time return flow obligation and is only entitled to the net excess credit after full augmentation <br />of Chain of lake depletions (determined per Case No 03CW8) and replacement of winter nine delayed return Bows Transit loss may be <br />assessed as indicated by the Water Commissioner or Division Engineer <br />[3] Required additional storage delivery equals [ I ] - [2] <br />[4J Pueblo Reservoir release equals [3] I 0 98 The 0 98 reflects a 2% transit loss to the East Pit Maximum lease is for 120 ac -ft delivered per <br />year Water will come from either Pueblo Reservoir or Clear Creek Reservoir <br />[5] Clear Creek Reservoir release equals [4] divided by 0 90, based upon a 10% transit loss to reach Pueblo Reservoir <br />[6] Backup water release required from Twin Lakes Reservoir equals remaining replacement requirements that are not met by the Hamp -Bell <br />credits and the Pueblo lease Transit losses are included and estimated to be the same as from Clear Creek Reservoir No Twin Lakes <br />Reservoir water is projected to be required for this SWSP <br />