My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-13_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2014-02-13_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:58 PM
Creation date
2/14/2014 1:45:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
2/13/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
Bishop Brogden Associates, Inc.
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5A <br />Transit Mix of Pueblo, Inc. - East Pit <br />Projected Depletions, Credits, and Releases (February 2014 - January 2016) <br />Scenario A - All Excess Summertime Ditch Credits Available to Transit Mix <br />(all values in acre -feet) <br />Notes <br />(11 Chain of Lakes augmentation requirement as specified in Case No 03C W8 Pueblo Board of Water Works is responsible for the augmentation requirement which is not covered by the Hamp -Bell Ditch credits <br />2J Average depletion associated with Transit Mix's Hamp -Bell Ditch rights is equal to the 21 -year cumulative monthly diversion limits given in Case No 03CW8 divided by 21 years and multiplied by the monthly depletion <br />factors given in the same case <br />[3] Average delayed return flow associated with Transit Mix's Hamp -Bell Ditch rights is equal to the 21 -year cumulativ e annual diversion limit given in Case No 03C W8 divided by 21 years and multiplied by the monthly <br />return flow factors given in the same case Transit Mix must replace the wintertime return flow obligation if PB W W does not have the right to store the credits <br />[41 Average Cast Pit Hamp -Bell credit ( -) available for augmentation or debit ( -) owed to the stream, equal to the greater of (2] - [l ] and zero - [3] <br />[5] Net depletion from evaporation, tamed material and dust control at East Pit, equal to Col [12] in Table 1 <br />[6] Summertime Hamp -Bell Ditch credit replacement of East Pit depletions (available to Transit Mix if PBW W does not have the right to store the credits) <br />[7] Required storage delivery equals [5] - [4] if> zero, else zero <br />[8] Excess Hamp -Bell Credit after East Pit replacement equals [5] - (4] if> zero, else zero <br />(9] Pueblo Reservoir release equals [71/ 0 98 The 0 98 reflects a 2% transit loss to the East Pit Maximum lease is for 120 ae -ft delivered per year Water will come from either Pueblo Reservoir or Clear Creek Reservoir <br />[ 10] Clear Creek Reservoir release equals [9] divided by 0 90, based upon a 10% transit loss to reach Pueblo Reservoir <br />11 1 ] Backup water release required from Twin Lakes Reservoir equals remaining replacement requirements that are not met by the Hamp -Bell credits and the Pueblo lease Transit losses are included and estimated to be the same <br />as from Clear Creek Reservoir No Twm Lakes Reservoir water is projected to be required for this S WSP <br />Calcula ion of East Pit Ham -Bell Ditch Credits <br />Pueblo East Pit <br />Excess Hamp- <br />Water Required From Pueblo Lease <br />Back Up Water <br />Chain of Lakes <br />Average Hamp -Bell <br />East Pit <br />Replacement Required <br />Bell Credit <br />Pueblo Clear Creek <br />Release Required <br />Augmentation <br />Hmnp -Bell Delayed <br />Credit ( +)/ <br />Net by Hamp -Bell Storage <br />After East Pit <br />Reservou Reservoir <br />From Twm Lakes <br />Requirement <br />Depletion Return Flow <br />Debit ( -) <br />Depletion Ditch Credit Delivery <br />Replacement <br />Release Release <br />Reservoir <br />Month <br />1 <br />2 3 <br />4 ] <br />151 161 7 <br />8 <br />9 10 <br />II <br />reb -14 <br />9 85 <br />000 -009 <br />-009 <br />6 31 000 640 <br />000 <br />6 53 7 25 <br />000 <br />Mar -14 <br />1120 <br />000 000 <br />000 <br />759 000 759 <br />000 <br />775 861 <br />000 <br />Apr -14 <br />1599 <br />661 000 <br />000 <br />728 000 728 <br />000 <br />742 825 <br />000 <br />May -14 <br />1615 <br />3801 000 <br />2186 <br />844 844 000 <br />1342 <br />000 000 <br />000 <br />Jun -14 <br />1506 <br />4168 000 <br />2662 <br />1095 1095 000 <br />1567 <br />000 000 <br />000 <br />Jul -14 <br />1125 <br />3702 -123 <br />2454 <br />1087 1087 000 <br />1367 <br />000 000 <br />000 <br />Aug -14 <br />1265 <br />2370 -075 <br />1030 <br />999 999 000 <br />031 <br />000 000 <br />000 <br />Sep -14 <br />12 42 <br />1430 -300 <br />-1 12 <br />928 000 1041 <br />000 <br />1062 11 80 <br />000 <br />Oct -14 <br />11 79 <br />3 30 -225 <br />-225 <br />7 86 000 10 11 <br />000 <br />1032 11 46 <br />000 <br />Nov -14 <br />1126 <br />000 -183 <br />-1 83 <br />679 000 862 <br />000 <br />880 977 <br />000 <br />Dcc -14 <br />845 <br />000 -049 <br />-049 <br />5 85 000 6 34 <br />000 <br />647 7 19 <br />000 <br />Jan -15 <br />845 <br />000 -042 <br />-042 <br />587 000 628 <br />000 <br />641 712 <br />000 <br />Feb -15 <br />985 <br />000 -009 <br />-009 <br />631 000 640 <br />000 <br />653 725 <br />000 <br />Mar -15 <br />1120 <br />000 000 <br />000 <br />759 000 759 <br />000 <br />775 861 <br />000 <br />Apr -15 <br />1599 <br />661 000 <br />000 <br />7 28 000 7 28 <br />000 <br />742 8 25 <br />000 <br />May -15 <br />1615 <br />3801 000 <br />2186 <br />844 844 000 <br />1342 <br />000 000 <br />000 <br />Jun -15 <br />1506 <br />4168 000 <br />2662 <br />1095 1095 000 <br />1567 <br />000 000 <br />000 <br />Jul -15 <br />1125 <br />3702 -123 <br />2454 <br />1087 1087 000 <br />1367 <br />000 000 <br />000 <br />Aug - IS <br />1265 <br />2370 -075 <br />1030 <br />999 999 000 <br />031 <br />000 000 <br />000 <br />Sep -15 <br />1242 <br />1430 -300 <br />-112 <br />928 000 1041 <br />000 <br />1062 1180 <br />000 <br />Oct -15 <br />11 79 <br />3 30 -2 25 <br />-2 25 <br />786 000 10 11 <br />000 <br />1032 11 46 <br />000 <br />Nov -15 <br />1126 <br />000 -183 <br />-183 <br />679 000 862 <br />000 <br />880 977 <br />000 <br />Dec-15 <br />845 <br />000 -049 <br />-049 <br />5 85 000 634 <br />000 <br />647 7 19 <br />000 <br />Jan -16 <br />845 <br />000 -042 <br />-042 <br />587 000 628 <br />000 <br />641 712 <br />000 <br />2 -014 Total <br />N4 5 <br />164 6 -10 I <br />77 I <br />97 I 402 630 <br />43 1 <br />643 71 5 <br />0 0 <br />2015 Total <br />1445 <br />1646 .10 1 <br />77 1 <br />97 1 402 630 <br />43 1 <br />643 71 5 <br />0 0 <br />Notes <br />(11 Chain of Lakes augmentation requirement as specified in Case No 03C W8 Pueblo Board of Water Works is responsible for the augmentation requirement which is not covered by the Hamp -Bell Ditch credits <br />2J Average depletion associated with Transit Mix's Hamp -Bell Ditch rights is equal to the 21 -year cumulative monthly diversion limits given in Case No 03CW8 divided by 21 years and multiplied by the monthly depletion <br />factors given in the same case <br />[3] Average delayed return flow associated with Transit Mix's Hamp -Bell Ditch rights is equal to the 21 -year cumulativ e annual diversion limit given in Case No 03C W8 divided by 21 years and multiplied by the monthly <br />return flow factors given in the same case Transit Mix must replace the wintertime return flow obligation if PB W W does not have the right to store the credits <br />[41 Average Cast Pit Hamp -Bell credit ( -) available for augmentation or debit ( -) owed to the stream, equal to the greater of (2] - [l ] and zero - [3] <br />[5] Net depletion from evaporation, tamed material and dust control at East Pit, equal to Col [12] in Table 1 <br />[6] Summertime Hamp -Bell Ditch credit replacement of East Pit depletions (available to Transit Mix if PBW W does not have the right to store the credits) <br />[7] Required storage delivery equals [5] - [4] if> zero, else zero <br />[8] Excess Hamp -Bell Credit after East Pit replacement equals [5] - (4] if> zero, else zero <br />(9] Pueblo Reservoir release equals [71/ 0 98 The 0 98 reflects a 2% transit loss to the East Pit Maximum lease is for 120 ae -ft delivered per year Water will come from either Pueblo Reservoir or Clear Creek Reservoir <br />[ 10] Clear Creek Reservoir release equals [9] divided by 0 90, based upon a 10% transit loss to reach Pueblo Reservoir <br />11 1 ] Backup water release required from Twin Lakes Reservoir equals remaining replacement requirements that are not met by the Hamp -Bell credits and the Pueblo lease Transit losses are included and estimated to be the same <br />as from Clear Creek Reservoir No Twm Lakes Reservoir water is projected to be required for this S WSP <br />
The URL can be used to link to this page
Your browser does not support the video tag.