Laserfiche WebLink
un-, <br />1 All right. Just to bring us back <br />2 here to the lay of the land at the New Horizon Mine. <br />3 And this particular photo, it's off of Google Earth. <br />4 It was taken in August of 2007. <br />5 The permit boundary has been drawn on <br />6 in red. The county roads are shown in blue. You'll <br />7 see that the mine as of August of 2007 had <br />8 progressed quite a ways west of County Road 2700, <br />9 well into the Morgan property, and the Benson <br />10 property was just about reclaimed, and the Lloyd -- <br />11 the mine was straddling the line between the Morgan <br />12 and the Lloyd parcel. I apologize. This particular <br />13 photo may not be in your packet. <br />14 All right. Just to -- just to <br />15 regroup. The issues that were identified in the <br />16 prehearing conference to be covered during this <br />17 hearing were, number one, postmining land use; <br />18 number two, topsoil, topsoil management; number <br />19 three, prime farmlands; and number four, whether or <br />20 not public participation had been followed in <br />21 accordance with the rules. <br />22 Now, regarding the subject of <br />23 postmining land use, what I've got on the screen at <br />24 this point is, this is the postmining land use map <br />25 that was submitted with the original application for <br />J <br />