Laserfiche WebLink
i <br />40 <br />1 aspects of the topsoil handling and the <br />2 revegetation. <br />3 And that alfalfa plan for the <br />4 cropland is a detailed 10 -year plan year by year <br />5 that we worked out with the NRCS and with the <br />6 Morgans that year one you plant this and you do <br />7 this; and then in the fall you do this; and year <br />8 two, three, and four you do this; and year five you <br />9 replow. <br />10 And it's an extremely detailed plan <br />11 that was worked out. And in addition to that, there <br />12 are very detailed procedures of how you monitor this <br />13 and how it goes through the whole 10 -year process. <br />14 And another thing that is important <br />15 to note on this prime farmland and cropland on the <br />16 Morgan property is that we have a fixed standard of <br />17 1.84 tons an acre in the first cut on that cropland. <br />18 And in working with the NRCS local <br />19 office for years now, they have said that that is a <br />20 high standard. That is not going to be easy to <br />21 meet. And with prime farmland we have to meet that <br />22 standard in year 8, 9 and 10. <br />23 So it's not in the company's interest <br />24 to try and skimp on the topsoil, to try and do <br />25 something wrong, to, you know, try and cut a corner <br />