Final Report Quality Assurance Monitoring & Test Results
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />PSES Pipe Rack Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />February 4, 2014 <br />ameO <br />AMEC personnel observed the testing of trial seam samples and documented test <br />results. Tensile testing of each trial seam coupon was observed to verify project yield <br />strengths were met during shear testing and failure did not occur in the weld during <br />peel testing. When trial seams did not meet specifications, AMEC verified the welding <br />apparatus was not used until two consecutive trial seams performed by the same <br />technician /apparatus combination met specifications. The trial seam test results for <br />extrusion and fusion seaming are presented in Appendix J.2. ECA used one <br />tensiometer during the project and one spare tensiometer was maintained on site. <br />Tensiometer certifications are presented in Appendix L. Figures 3 and 4 show the <br />codes used to designate passing and failing test results. <br />6.3.2 Seaming Observations <br />AMEC personnel observed seams before, during and after welding. Each seam was <br />checked for adequate overlap prior to welding and to verify the seam area was clean <br />and dry. <br />AMEC documented which ECA technician performed the seaming and what seaming <br />equipment was used. Following the completion of a seam and routine repairs, AMEC <br />checked the full length of each seam to verify no additional repairs were required. In <br />the event additional repairs were needed, AMEC marked the location requiring repair <br />on the geomembrane, documented the location, and brought the repair area to the <br />attention of ECA. Once ECA made repairs, AMEC checked the repair location to verify <br />completion. All seams were inspected for quality and completion. AMEC personnel <br />conducted a final walk through to verify completion of the entire geomembrane system <br />and to identify any additional damage that may have occurred during construction <br />operations. <br />Recorded observations made during seaming for the PSES Pipe Rack Liner Extension <br />geomembrane met project specifications and a summary is presented in Appendix J.3. <br />6.4 Defect and Repair Observations <br />AMEC inspected geomembrane panels for damage that may have occurred during <br />manufacture, transport, deployment, or installation. Any damage noted (during or after <br />deployment) by AMEC was reported. AMEC repeatedly observed all panels and <br />seams for defects until Ames covered the geomembrane with DCF. <br />AMEC documented defects by assigning a unique defect identification code to each <br />defect, and marked each defect code on the geomembrane. The summaries of <br />defects and repairs, including the approximate locations of each repair, are presented <br />in Appendix J.4. <br />15 <br />