My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 3.03 SCHEDULES <br /> CONTRACTOR shall notify MANAGER at least forty-eight(48)hours before each concrete placement. <br /> 3.04 FIELD QUALITY CONTROL <br /> A. Concrete testing will be performed by CONTRACTOR. <br /> B. Four standard 4-inch diameter by 8-inch long test cylinders shall be prepared for every 50 yards of <br /> concrete placed or one per day,whichever is greater,at the discretion of the MANAGER,DESIGN <br /> ENGINEER,and CERTIFYING ENGINEER. <br /> C. Standard compression tests shall be performed to determine the compressive strength: one at seven <br /> (7)days and two at twenty-eight(28)days The fourth cylinder shall be kept in reserve for additional <br /> testing,if necessary. <br /> D. Slump testing shall be performed at the time the cylinders are prepared. <br /> ***END OF SECTION*** <br /> Section 03320 Page 3 of 3 May 9,2012 <br /> Concrete Plug Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.