Laserfiche WebLink
ameO <br /> C. Storage and Protection <br /> 1. MANAGER will provide area for on-site storage of the geogrid rolls from time of delivery <br /> until installation. <br /> 2. The storage and handling of the materials is the responsibility of CONTRACTOR from the <br /> time the materials are manufactured until the time the completed installation is accepted. <br /> CONTRACTOR is responsible for preparing the storage location and for the protection of <br /> the materials from the elements(e.g.ultraviolet light,moisture,temperature,etc.). <br /> 3. After CONTRACTOR has removed material from storage,CONTRACTOR shall protect <br /> geogrid from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, excessive <br /> heat,and other sources of damage. <br /> 4. CONTRACTOR shall preserve integrity and readability of the geogrid roll labels, and <br /> store the rolls such that MANAGER and CERTIFYING ENGINEER have access to the <br /> package slips or roll labels for each roll to verify roll acceptance. <br /> 5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br /> stacked more than two rolls high. <br /> Section 02776.1 Page 3 of 6 May 9,2012 <br /> Geognd Revision 1 <br />