Laserfiche WebLink
ameO <br /> SECTION 02776.1 GEOGRID <br /> PART 1: GENERAL <br /> 1.01 SUMMARY <br /> This SPECIFICATION describes requirements for the manufacture, fabrication (if needed), supply, and <br /> installation of geogrid over potential mine workings, as shown on the DRAWINGS;and construction quality <br /> control monitoring and testing. All procedures,operations,and methods shall be in strict compliance with the <br /> SPECIFICATIONS,Construction Quality Assurance Plan,and the DRAWINGS. <br /> 1.02 REFERENCES <br /> A. ASTM D1248-Specification for Polyethylene Plastics Molding and Extrusion Materials. <br /> B. ASTM D4218 -Test Method for Carbon Black Content in Polyethylene Compounds by the Muffle- <br /> Furnace Technique. <br /> C. ASTM D4355 - Test Method for Deterioration of Geotextile by Exposure to Light, Moisture, and <br /> Heat in a Xenon Arc Type Apparatus. <br /> D. ASTM D5262-Test Method for Evaluating Creep and Creep Rupture Behavior of Geosynthetics. <br /> E. ASTM D5732-Test Method for Stiffness of Non-Woven Fabrics Using the Cantilever Test. <br /> F. ASTM D6637 Method A-Test Method for Determining Tensile Properties of Geogrids by the Single <br /> or Multi-Rib Tensile Method. <br /> G. GRI-Test Method GG2-Geogrid Junction Strength. <br /> H. GRI-Test Method GG4-Determination of the Long-Term Design Strengths of Geogrids. <br /> I. EPA 9090-Test Method for Determining the Chemical Waste Compatibility of Synthetic Liners. <br /> 1.03 SUBMITTALS <br /> CONTRACTOR shall provide the following information relating to the geogrid MANUFACTURER and <br /> INSTALLER prior to commencement of the WORK: <br /> A. Information from the MANUFACTURER including company name,address,telephone number,and <br /> the names of the company president and quality control manager. <br /> B. Quality Control Manuals from the MANUFACTURER for the installation and testing of the geogrid. <br /> C. Quality Control Certificates from the MANUFACTURER. <br /> 1.04 QUALITY ASSURANCE <br /> A. All work shall be constructed, monitored, and tested in compliance with the requirements of the <br /> Construction Quality Assurance Plan (Section 01400.2). CONTRACTOR and <br /> Section 02776 1 Page 1 of 6 May 9,2012 <br /> Geogrid Revision 1 <br />