My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> C. Extend geomembrane into the anchor trench as shown in the DRAWINGS. The geomembrane <br /> shall be seamed along the entire distance of the anchor trench to the termination of the <br /> geomembrane sheet. <br /> 3.04 PROTECTION <br /> CONTRACTOR shall be responsible for the following: <br /> A. Do not use equipment or tools, which damage the geomembrane by handling, trafficking, <br /> excessive heat,leakage of hydrocarbons,or other means. <br /> B. Ensure prepared surface underlying geomembrane has not deteriorated since previous acceptance, <br /> and remains acceptable until acceptance by CC&V,as detailed in Section 3.02. <br /> C. Keep geotextile elements immediately underlying the geomembrane clean and free of debris. <br /> D. Do not permit personnel to smoke or wear damaging shoes while working on geomembrane. <br /> E. Unroll panels in a manner, which prevents scratches or crimps in geomembrane and does not <br /> damage supporting Soil Liner Fill of Bedding Fill. <br /> F. Place panels in a manner that prevents wrinkles (especially differential wrinkles between adjacent <br /> panels). <br /> G. Prevent wind uplift and damage to geomembrane subgrade by providing temporary and <br /> permanent loading and/or anchoring that will not damage geomembrane. <br /> H. Minimize direct contact of equipment and personnel with geomembrane. <br /> I. Protect geomembrane in areas where excessive traffic is expected with geotextiles, extra <br /> geomembrane, or other materials acceptable to MANAGER, DESIGN ENGINEER, and <br /> CERTIFYING ENGINEER. <br /> 3.05 FIELD PANEL DEPLOYMENT <br /> A. CONTRACTOR shall install field panels at locations indicated on CONTRACTOR's layout <br /> plan,as approved by MANAGER,DESIGN ENGINEER,and CERTIFYING ENGINEER. <br /> B. CONTRACTOR shall replace damaged (i.e., torn, twisted, or crimped) field panels, or portions <br /> thereof, at no cost to CC&V. CONTRACTOR shall repair less serious damage according to <br /> Article 3.10 of this Section,at no cost to CC&V. CERTIFYING ENGINEER shall determine if <br /> material is to be repaired or replaced. <br /> C. CONTRACTOR shall remove damaged panels, portions of damaged panels, and other <br /> geomembrane scrap. <br /> D. CONTRACTOR shall not deploy more geomembrane field panels in one day than can be seamed <br /> during the day of deployment. <br /> E. Geomembrane deployment shall proceed between ambient temperatures of fourteen degrees (14' <br /> F) Fahrenheit to one-hundred degrees (1000) Fahrenheit. Geomembrane placement shall not be <br /> Section 02776 Page 14 of 22 May 9,2012 <br /> Geomembrane Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.