Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 3. Sharp hollow needle,or other approved pressure feed device. <br /> 4. An air pressure-monitoring device. <br /> PART 3: EXECUTION <br /> 3.01 SUBGRADE <br /> CONTRACTOR,on a daily basis, shall certify in writing that the surface on which the geomembrane will <br /> be installed is acceptable. It will be the CONTRACTOR's responsibility to maintain, protect, and if <br /> required, return the subgrade in the condition that was originally accepted, prior to geosynthetic <br /> deployment until accepted by CC&V, under criteria identified in Section 02200 as per the Bedding Fill <br /> and Soil Liner Fill SPECIFICATIONS. <br /> 3.02 ACCEPTANCE <br /> CONTRACTOR shall retain all ownership and responsibility for the geomembrane until final acceptance. <br /> The geomembrane shall be accepted by CC&V when all of the following conditions are met: <br /> 1. Installation is finished. <br /> 2. Verification of the adequacy of all seams and repairs, including associated testing, is <br /> complete. <br /> 3. Certification, including QC documentation is provided by CONTRACTOR to <br /> MANAGER. <br /> 4. Recommended acceptance by MANAGER and CERTIFYING ENGINEER. <br /> 5. The entire PROJECT, including Drain Cover Fill placement and Diversion Channel <br /> construction is completed. <br /> 3.03 ANCHOR TRENCH <br /> A. The anchor trenches shall be excavated to the lines,grade, and width shown on the DRAWINGS, <br /> prior to geosynthetic placement. CERTIFYING ENGINEER shall verify that the anchor trench <br /> has been constructed according to the DRAWINGS. <br /> Slightly rounded corners shall be provided in the trench where the geomembrane adjoins the <br /> trench so as to avoid sharp bends in the geomembrane. <br /> B. The anchor trench shall be backfilled and compacted as approved by MANAGER, DESIGN <br /> ENGINEER,and CERTIFYING ENGINEER. Trench backfill material shall be placed in eight <br /> (8)to twelve(12) inch thick loose lifts and compacted by wheel rolling with light,rubber-tired, or <br /> other light compaction equipment,as approved by CERTIFYING ENGINEER. <br /> Care shall be taken when backfilling the trenches to prevent any damage to the geomembrane. At <br /> no time shall construction equipment come into direct contact with the geomembrane. If damage <br /> occurs, it shall be repaired by CONTRACTOR prior to the completion of backfilling, at no cost <br /> to CC&V. <br /> Section 02776 Page 13 of 22 May 9,2012 <br /> Geomembrane Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.