ameO <br /> an acceptable level or meet project specifications as determined by MANAGER and <br /> CERTIFYING ENGINEER. It shall then be compacted before the next layer of fill <br /> material is placed. Determination of such dry or wet conditions shall be made by <br /> CERTIFYING ENGINEER. <br /> 4. The distribution of materials shall be such that the fill is free from voids, lenses, pockets, <br /> streaks, or layers of material differing substantially in texture or gradation from the <br /> surrounding material. The material of a fill shall be as described in Article 2.01 of this <br /> Section. <br /> 5. Unless otherwise approved by MANAGER and CERTIFYING ENGINEER, the entire <br /> fill surface shall be at or near the same elevation at all times during construction. At all <br /> times during construction, the surface of the fill shall be graded and maintained by the <br /> CONTRACTOR to prevent ponding of water and to allow for storm water drainage. <br /> 6. Except as otherwise specified or approved by MANAGER and CERTIFYING <br /> ENGINEER,the CONTRACTOR shall dump and spread fill in such a manner so that no <br /> excessive gaps are left between successively dumped loads of materials. The fill shall be <br /> leveled prior to compaction by means of a dozer or grader, or other suitable approved <br /> equipment,to obtain a surface free from depressions. <br /> 7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where space <br /> is limited or otherwise specified, CONTRACTOR shall place fill by routing the hauling <br /> and spreading units approximately parallel to the axis of the fill. As far as practical,hauling <br /> units shall be so routed that they do not follow in the same paths, but split their tracks <br /> evenly across the surface of the fill to enhance compaction. <br /> 8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in the <br /> borrow areas. <br /> CONTRACTOR shall maintain fill materials within the moisture content range required to <br /> permit proper compaction to the specified density with the equipment being used. The <br /> moisture content of the fill materials, prior to and during compaction, shall be uniform <br /> throughout each layer of the material. <br /> Prior to mixing of wet and dry material on the fill to obtain the proper moisture content, <br /> approval shall be obtained from CERTIFYING ENGINEER. Mixed material shall have a <br /> uniform distribution of the moisture content prior to placement on the subsequent lift. <br /> When materials spread on the fill are too dry for proper compaction, CONTRACTOR <br /> shall spray water on each layer of the fill and shall work the moisture into the fill by <br /> harrowing or other approved means, until a uniform distribution of moisture is obtained. <br /> Material that is too wet for proper compaction, as determined by CERTIFYING <br /> ENGINEER,shall be removed from the fill and/or spread out and permitted to dry,assisted <br /> by disking and harrowing or mixing in dry material when permitted by CERTIFYING <br /> ENGINEER, if necessary, until the moisture content is reduced to an amount suitable for <br /> obtaining the specified degree of compaction,at no cost to CC&V. <br /> 9. After each layer of fill material has been placed,spread,and moisture-conditioned,the layer <br /> shall be compacted by passing compaction equipment over the entire surface of the layer a <br /> sufficient number of times to obtain the required density,as specified herein. <br /> Section 02200 Page 8 of 16 May 9,2012 <br /> Earthworks Revision 1 <br />