Laserfiche WebLink
ameO <br /> 7.06 CONSTRUCTION CERTIFICATION REPORT: <br /> At the completion of the project, the CQA Monitor shall submit to the MANAGER a Construction <br /> Certification Report. This report shall certify that the work has been performed in compliance with the <br /> design DRAWINGS and project SPECIFICATIONS and will contain the following information: <br /> ■ summary of all construction activities; <br /> ■ observation and test data sheets; <br /> ■ photographic documentation; <br /> ■ CQA staff scheduling; <br /> ■ copies of weekly reports; <br /> ■ CONTRACTOR'S subgrade acceptance forms; <br /> ■ temperature monitoring results; <br /> ■ geosynthetic quality control documents; <br /> ■ geosynthetic quality assurance documents, <br /> ■ geomembrane installation observations, such as for deployment, trial seams, defect repair, <br /> destruct testing and non-destructive testing; <br /> ■ sampling,testing locations,and test results; <br /> ■ changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br /> these changes; <br /> ■ record DRAWINGS;and <br /> ■ a certification statement that construction was completed in compliance with the <br /> DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br /> ENGINEER registered in the State of Colorado. <br /> ***END OF SECTION *** <br /> Section 01400 2 Page 11 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />