My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 7.06 CONSTRUCTION CERTIFICATION REPORT: <br /> At the completion of the project, the CQA Monitor shall submit to the MANAGER a Construction <br /> Certification Report. This report shall certify that the work has been performed in compliance with the <br /> design DRAWINGS and project SPECIFICATIONS and will contain the following information: <br /> ■ summary of all construction activities; <br /> ■ observation and test data sheets; <br /> ■ photographic documentation; <br /> ■ CQA staff scheduling; <br /> ■ copies of weekly reports; <br /> ■ CONTRACTOR'S subgrade acceptance forms; <br /> ■ temperature monitoring results; <br /> ■ geosynthetic quality control documents; <br /> ■ geosynthetic quality assurance documents, <br /> ■ geomembrane installation observations, such as for deployment, trial seams, defect repair, <br /> destruct testing and non-destructive testing; <br /> ■ sampling,testing locations,and test results; <br /> ■ changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br /> these changes; <br /> ■ record DRAWINGS;and <br /> ■ a certification statement that construction was completed in compliance with the <br /> DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br /> ENGINEER registered in the State of Colorado. <br /> ***END OF SECTION *** <br /> Section 01400 2 Page 11 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.