Laserfiche WebLink
ameO <br /> ■ description of ongoing construction,detailing deployment areas; <br /> ■ numbering system identifying test or sample number; <br /> ■ location and identification of repairs and date of repair; <br /> ■ length and/or thickness measurements for geomembrane panels or seams; <br /> ■ welding machine temperatures and settings; <br /> ■ welding machine and technician identifications; <br /> ■ location of tests and test results; <br /> ■ identification of testing technicians and time of tests;and <br /> ■ signature or initials of the CQA Monitor. <br /> 7.03 PHOTO DOCUMENTATION: <br /> The CQA Monitor shall photograph all phases of construction. <br /> 7.04 DESIGN AND SPECIFICATION CHANGES: <br /> During construction, the need to address design and SPECIFICATION changes, modifications, or <br /> clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will notify <br /> the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION changes <br /> shall only be made with written agreement from the MANAGER and DESIGN ENGINEER. <br /> 7.05 WEEKLY PROGRESS REPORTS: <br /> The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA activities. <br /> This report shall be submitted to the MANAGER and shall include the following information: <br /> ■ date,project name,and location; <br /> ■ summary of construction related activities; <br /> ■ summary of geomembrane deployed(per day); <br /> ■ summary of samples taken and test results; <br /> ■ summary of geomembrane areas completed,and approved for Drain Cover Fill placement; <br /> ■ summary of deficiencies and/or defects and resolutions;and <br /> ■ signature of the CQA Monitor. <br /> Section 01400 2 Page 10 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />