Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> Non-Destructive Seam Continuity Testing - The CQA Monitor shall verify that all seams and <br /> repair are non-destructively tested in compliance with the project SPECIFICATIONS. If a seam <br /> cannot be tested, the seam shall be capped. The CQA Monitor shall observe capping operations. <br /> The CQA Monitor shall verify that test equipment and gauges are functioning properly and that <br /> test procedures are in compliance with the project SPECIFICATIONS. The CQA Monitor shall <br /> verify that all seams and repairs with failing test results are repaired and/or re-tested until passing <br /> results are achieved. The CQA Monitor shall record all non-destructive test locations on the <br /> vacuum test and pressure test log forms. <br /> Destructive Seam Testing - The INSTALLER shall obtain samples, at locations selected by the <br /> CQA Monitor, of the field seamed geomembrane approximately 24 inches along and 12 inches <br /> across the seam and centered over the seam as follows: <br /> ■ a minimum of one sample per day; <br /> ■ a minimum of one sample for each geomembrane seamer; <br /> ■ a minimum of one sample every 500 feet of seaming;and <br /> ■ seams that appear suspect to the CQA Monitor. <br /> The CQA Monitor shall witness the testing of destructive seam samples by the INSTALLER. <br /> The INSTALLER shall mark all samples with their roll and seam number,date,machine number, <br /> welding technician identification, extruder and nozzle/wedge temperature, and ambient air <br /> temperature. <br /> The INSTALLER shall test all destructive samples in compliance with the project <br /> SPECIFICATIONS. <br /> The INSTALLER shall be responsible for patching all areas cut for test samples in accordance <br /> with the SPECIFICATIONS and MANUFACTURER's requirements and performing non- <br /> destructive testing (i.e., vacuum box) of the seams. The CQA Monitor shall record test locations <br /> on the geomembrane defect log forms. Additional testing information will be recorded on the <br /> geomembrane seam destructive sample log form. The CQA Monitor shall track failing tests as <br /> described in the SPECIFICATIONS. <br /> Repairs- The CQA Monitor shall observe and document that all repair materials,techniques, and <br /> procedures used for repairs are approved in advance and meet the requirements of the project <br /> SPECIFICATIONS. The CQA Monitor shall verify that all defects and repairs are marked, <br /> recorded, repaired, tested, and wrinkles are addressed, prior to being covered by other materials; <br /> and that repairs are performed as specified, including proper patch size or dimension. The CQA <br /> Monitor shall record defects and repairs on the defect and repair log forms. <br /> 6.03.02 GEOTEXTILE: <br /> During geotextile installation, the CQA Monitor shall observe and document deployment, field seaming, <br /> and repairs to assure that the installation is in compliance with the SPECIFICATIONS. <br /> Deployment - The CQA Monitor shall verify that the subgrade is free of deleterious materials <br /> prior to deployment, anchoring is achieved as specified, specified methods are used to minimize <br /> wrinkles and protect underlying layers during cutting of materials,and deployment procedures are <br /> performed in compliance with the project SPECIFICATIONS. <br /> Section 01400.2 Page 8 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.