Laserfiche WebLink
ameO <br /> ■ obtain geosynthetic packaging identification slips for verification and generation of an on-site <br /> materials inventory; <br /> ■ observe subgrade conditions prior to geosynthetics installation and verify that any <br /> deficiencies,as defined in Section 02200 of the SPECIFICATIONS,are corrected; <br /> ■ observe permanent anchoring of geosynthetics to verify that design and project <br /> SPECIFICATIONS are met; <br /> ■ observe that required overlap distances are met; <br /> ■ monitor and record ambient air temperatures; <br /> ■ verify that no continuous horizontal seams are placed on slopes unless approved by <br /> CERTIFYING ENGINEER;and <br /> ■ observe and document that all soil materials placed on top of the geosynthetics are done in <br /> such a manner as to ensure that the geosynthetics are not damaged. <br /> 6.03.01 GEOMEMBRANE: <br /> During geomembrane installation, the CQA Monitor shall observe and document deployment, trial seams, <br /> field seaming, non-destructive and destructive seam testing, and repairs to assure that the installation is in <br /> compliance with the SPECIFICATIONS. <br /> Deployment- The CQA Monitor shall verify that only approved materials are used, each panel is <br /> given a unique panel number, no geomembrane is placed during unsuitable weather conditions as <br /> outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the geomembrane is not <br /> damaged during installation, and anchoring is performed in compliance with the <br /> SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the deployment on <br /> the deployment log form. <br /> Trial Seams-The CQA Monitor shall verify that seaming conditions are performed in compliance <br /> with SPECIFICATIONS, tests are performed at required intervals, specified test procedures are <br /> followed,and retests are performed in compliance with the SPECIFICATIONS. If the ambient air <br /> temperature measured by the CQA Monitor is above 35°F for the entire day, the INSTALLER <br /> shall perform trial seams at the beginning of each crew shift, and immediately following any work <br /> stoppage (i.e., for lunch, weather conditions, etc.) of for more than 1 hour or at the discretion of <br /> the CERTIFYING ENGINEER, for each seaming apparatus used that day. If the ambient air <br /> temperature measured by the CQA Monitor is below 35°F for the entire day, the INSTALLER <br /> shall perform four (4) trial seams, at approximately the same time interval throughout the <br /> scheduled work day. Each Seamer shall make at least one trial seam each day. Seaming operation <br /> shall not commence until the CQA Monitor has determined that the seaming process is meeting <br /> the SPECIFICATION requirement and is acceptable. The CQA Monitor shall record the trial <br /> weld results on the trial seam log form. <br /> Field Seaming - The CQA Monitor shall verify that only approved equipment and personnel <br /> perform welding, all welding is performed under suitable conditions as specified in the project <br /> SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to project <br /> requirements, and that grinding techniques and extrudate meet project requirements for extrusion <br /> welding. The CQA Monitor shall record all field seaming on field seaming log forms. <br /> Section 01400 2 Page 7 of 11 May 9,2012 <br /> Geosynthetic CQA Plan Revision 1 <br />