Laserfiche WebLink
amec'9 <br />D) Geomembrane Exposure <br />No work performed during the week. <br />E) Geomembrane Acceptance <br />No work performed during the week. <br />IV)Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to overburden fill <br />placement. Subgrade temperatures were monitored prior to fill placement. <br />AMEC observed excavation and placement of overburden fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed slope contouring of placed overburden fill for the Mill Site Earthworks project. <br />AMEC observed, obtained samples, and assisted in the process of SLF material at the East Cresson <br />Clay Process area. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade preparation for fill placement for the Mill Site Earthworks project. <br />Continue slope contouring for the Mill Site Earthworks project. <br />Continue overburden fill placement for the Mill Site Earthworks project. <br />Continue construction of the catch berm and storm water controls for the Mill Site Earthworks project <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V.• <br />CC &V held a weekly construction meeting on July 17, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />MEW Weekly Report WE 07.21.2012 <br />