Laserfiche WebLink
2I11@O <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />C) Slope Contouring <br />Slope contouring was performed using a John Deere 850 excavator. Material generated during <br />slope contouring was placed as overburden fill at the top of the slope. <br />D) Soil Liner Fill (SLF) <br />Soil Liner Fill processing was paused due to saturated stockpiles and slick work areas. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />8,349 <br />42,626 <br />DCF processing is temporarily paused <br />Total <br />8,349 <br />42,626 <br />DCF processing is temporad ly paused <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />tons <br />tons <br />DCF Process <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />158,613 <br />DCF processing is temporad ly paused <br />F) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />No work performed during the week. <br />B) Drilling <br />No work performed during the week. <br />C) Remediation <br />No work performed during the week. <br />III) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />B) Geomembrane Installation <br />No work performed during the week. <br />C) Anchor Trench <br />No work performed during the week. <br />MEW Weekly Report WE 07.21.2012 <br />