t <br />��i <br />Primary Underdrain: No work was performed on the Primary underdrain during this reporting period. A total of <br />1,294.60 feet of Primary underdrain has been completed. <br />Tree /Slash Grubbing and Clearing, Chipping: <br />No grubbing or clearing took place during this reporting period. <br />B) Underground Workings <br />No underground working remediation or confirmatory drilling occurred during this reporting period. <br />C) Highway 67 <br />No significant construction activities occurred at the Hwy 67 Realignment. <br />South MSE Wall: <br />No significant construction activities occurred at the South MSE Wall. <br />11) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Production drilling and snow <br />removal. <br />11) Laboratory Activities: Permeability laboratory testing continued during this reporting period. <br />No samples were obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: None <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None. <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Eric Lorenson Date: 30 Nov 2013 <br />Reviewed By: <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By: <br />Date: <br />Date: <br />Page 2 of 4 MLE2 WE 11.30.13.doc <br />